Drilling Confirms Widespread REE at Pimenta Project, Brazil
Released
Released
Announcement PDF
ASX Announcement
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL
ACN 122 995 073
WIDESPREAD SURFACE REE MINERALISATION CONFIRMS
NEW LARGE-SCALE REE ZONE IN BRAZIL
Verity Resources Limited (ASX:VRL, Verity or the Company) is pleased to announce auger drilling results from
the Pimenta Project in Minas Gerais, Brazil. The program confirms widespread near-surface rare earth element
(REE) mineralisation within a deeply weathered soil-saprolite profile developed over granite.
Verity Director, Patick Volpe commented,
“Pimenta is shaping up as a compelling surface REE prospect. Intercepts such as 4m @ 2,683ppm TREO
from surface, MREO proportions up to 28%, and consistently strong NdPr underpin a high-value
magnet mix. The scale of mineralisation across shallow soils and saprolite, combined with simple
access and logistics in Minas Gerais, gives us confidence to push ahead with further exploration work.”
HIGHLIGHTS
• Auger drill program confirmed widespread REE mineralisation at the Pimenta Project in north-east
Minas Gerais, Brazil – a new REE discovery zone
• Program followed up over previous surface sampling that returned consistent rare earth elements
mineralisation up to 25,817ppm TREO (2.58% TREO), with average of 25% high value magnet rare
earths (MREO) over 147 samples
• 38 auger drill holes were completed and confirmed surface REE mineralisation within a weathered
soil-saprolite profile developed over granitic protolith
• Significant from surface intercepts include:
o 4m @ 2,053ppm TREO, 25% MREO from surface (PMT-AUG-011)
o 5m @ 2,250ppm TREO, 26% MREO from surface (PMT-AUG-014)
o 4m @ 2,204ppm TREO, 26% MREO from surface (PMT-AUG-016)
o 4m @ 2,683ppm TREO, 26% MREO from surface (PMT-AUG-020)
o 4m @ 2,322ppm TREO, 24% MREO from surface (PMT-AUG-039)
incl. 1m @ 4,171ppm TREO, 26% MREO
o 5m @ 2,329ppm TREO, 25% MREO from surface (PMT-AUG-043)
o 7m @ 2,193ppm TREO, 28% MREO from surface (PMT-AUG-044)
• >20km airborne geophysical signature has been confirmed and results to date indicate wide-
spread allanite-hosted mineralisation, with a similar geological signature to American Rare Earths
Limited (ASX:ARR) 2.63Bt @ 3,292ppm TREO Halleck Creek Project
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
Figure 1. Pimenta Project with significant TREO intercepts, over airborne radiometric image.
The auger dataset indicates shallow, laterally continuous REE enrichment across residual soil and weathered
granite terrains. Top intervals include 4m @ 2,683 ppm TREO (26% MREO) and 5m @ 2,250 ppm TREO (26%
MREO), with average MREO proportions of 24–27%. LREEs (Ce, La, Nd, Pr) dominate, accounting for over 90%
of total REO, consistent with allanite-dominated mineralogy.
Interpretation of TREO distribution and %MREO confirms a coherent geochemical system controlled by granitic
source and minimal secondary mobilisation. The auger results will guide the next phase of drilling and
metallurgical sampling to evaluate depth extension and extraction characteristics.
The auger campaign defined broad, consistent mineralisation over multiple traverses. The mineralisation
exhibits excellent continuity and favourable MREO/TREO ratios similar to granite-hosted systems such as
American Rare Earths Limited (ASX:ARR) Halleck Creek allanite REE deposit with 2.63Bt @ 3,292 ppm TREO
Resource (Measured + Indicated + Inferred)1.
These early-stage results provide a clear foundation for follow-up infill drilling and metallurgical testwork,
1 ASX:ARR Halleck Creek Project ASX release “Updated Scoping Study”, 24 February 2025.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
targeting both near-surface material and underlying granite-hosted REE mineralisation.
Multi-element geochemistry supports an evolved granitic source for REE. Notable accessory elements included
anomalous gallium intercepts of 4m @ 62ppm Ga2O3 including to 1m @ 77ppm Ga2O3 (PMT-AUG-044).
Figure 2. Cross section of the auger holes PMT-AUG-043 and PMT-AUG-044.
About the Pimenta Project
The Pimenta Project is located in the well-established mining region of northern Minas Gerais, Brazil. The
Project targets a large, granite-hosted REE system enriched in REE and critical accessory minerals including
gallium (Ga). The Project is centred on the Mesoproterozoic-age Santo Antônio do Jacinto Granite Complex.
Early exploration has confirmed widespread, high-grade REE enrichment at surface, with saprolite samples
returning up to 25,817ppm TREO (2.6% TREO) and soils up to 4,635 ppm TREO. Auger drilling has confirmed
widespread near-surface REE mineralisation over 20km of radiometric anomalies (allanite mineral). The
mineralisation is interpreted as residual, with consistent REE geochemistry between fresh granite and overlying
regolith indicating limited mobility and favourable metallurgical properties.
Importantly, the Project benefits from excellent infrastructure, with proximity to sealed roads, hydroelectric
power, and an experienced local workforce.
This announcement has been authorised for release by the Board of Verity Resources Limited.
For further information, please contact:
Verity Resources Limited
info@verityresources.com.au
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
About Verity Resources
Verity Resources owns 100% of the Monument Gold project located near Laverton in Western Australia. This project currently has
a JORC-compliant (2012) Inferred resource of 3.257 Mt @ 1.4 g/t for 154,000 ounces Au. (inferred resources calculated by CSA
Global in 2021 to JORC 2012 compliance using a 0.5 g/t cut-off grade; see 2 August 2021 ASX announcement “Mineral Resources
Estimate declared for Monument Gold Project “for further information).
Verity Resources also holds a supply critical metals portfolio via a joint venture that includes rare earth elements, lithium, gold,
base and precious metals in Brazil, including licences in the “Lithium Valley” and Poços de Caldas in the state of Minas Gerais,
globally known as prolific lithium and rare earth elements districts respectively. The Company also owns 70% of the Pimenta
Project, a potential large-scale REE project in eastern Minas Gerais.
Verity Resources also holds 100% of large critical metals projects in the Limpopo Mobile Belt in Botswana, a district known for
hosting major nickel and copper-producing operations. The Company’s Botswana portfolio contains three flagship projects where
high-grade Cu-Ag (Airstrip and Dibete) and a Maiden JORC Inferred Resource (Maibele North) have been discovered. Maibele
North currently hosts a JORC (2012) inferred resource of 2.4Mt @ 0.72% Ni and 0.21% Cu + PGE’s + Co + Au and is located within
50km of the Selebi-Phikwe mine recently acquired by NASDAQ-listed NexMetals Mining Corp. (NASDAQ:NEXML).
Competent Persons Statement (Brazil)
The information in this announcement that relates to Exploration Results is based on and fairly represents information and
supporting documentation compiled by Mr Antonio de Castro, BSc (Hons), MAusIMM, CREA, who acts as AXEL´s Senior
Consulting Geologist through the consultancy firm, ADC Geologia Ltda. Mr. de Castro has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (the JORC Code). Mr Castro consents to the inclusion in the announcement of the matters based
on his information in the form and context in which it appears.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the above announcement. No
material exploration data or results are included in this document that have not previously been released publicly. The source of
all data or results have been referenced.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s mineral properties, planned exploration program(s) and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may,” "potential," "should," and
similar expressions are forward looking statements. All such statements are subject to certain risks and uncertainties, many of
which are difficult to predict and generally beyond the control of the Company, which could cause actual results to differ materially
from those expressed in, or implied or projected by, the forward-looking information and statements. Our audience is cautioned
not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or
to reflect the occurrence of or non-occurrence of any events.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
Monument Gold Project, Western Australia, Resource Information
Korong Resource
Deposit Tonnes Grade (g/t) Au (Oz)
Korong 3,034,000 1.4 139,000
Waihi 223,000 2.1 15,000
Total 3,257,000 1.4 154,000
Table 2: JORC-compliant (2012) Inferred Resource was calculated at Korong and Waihi by CSA Global Pty Ltd in 2021 (see Table 2) using a
0.5g/t cut-off grade. See ASX announcement on 2 August 2021 “Mineral Resource Estimate Declared for Monument Gold Project”.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from the following Company announcement
released to the ASX:
• 29 April 2025 “Significant REE, Gallium And Titanium Anomalies Return From Pimenta Project”
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
Appendix 1: JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has
been done, this would be relatively simple
(e.g., ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverized to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
Auger holes
• At each drill site, the surface was thoroughly
cleared. Soil and saprolite samples were gathered
every 1 meter with precision, carefully logged and
photographed. Each sample was then sealed in
plastic bags and clearly labelled for identification.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Auger drilling
• A motorized 2.5HP soil auger with a 3” drill bit,
reaching depths of up to 20 meters, was used to
drill. The drilling is an open hole, meaning there is
a significant chance of contamination from the
surface and other partsof the auger hole.Holesare
vertical and not oriented.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Auger drilling
• No recoveries arerecorded.
• No relationship is believed to exist between
recovery and grade.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
The geology was described in a field facility by a
geologist - logging focused on the soil (humic)
horizon, saprolite, and fresh rock boundaries.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
Criteria JORC Code explanation Commentary
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
The depth of geological boundaries is honored
and described meter by meter.
Other important parameters for collecting data
include grain size, texture, and color, which can
help identify the parent rock beforeweathering.
All drilled holes have a digital photographic
record. The log is stored in a Microsoft Excel
template with inbuilt validation tables and a pick
list to avoid data entry errors.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Sample preparation (drying, crushing, splitting
and pulverising) is carried out by SGS laboratory,
in Vespasiano MG, using industry-standard
protocols:
• dried at 105°C
• Crushing to 90% < 2 mm
• Homogenisation and splitting in Jones riffle
• Pulverising 250–300 g in a steel
mill to 90% <200 mesh (75 µm).
• Aliquot selection from pulp packet
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias)
and precision have been established.
1 blank sample, 1 certified reference material
(standard) sample and 1 field duplicate sample were
inserted by company into each 25 sample sequence.
Standard laboratory QA/QC procedures were
followed, including inclusion of standard, duplicate
and blank samples.
The assay technique used was Sodium Peroxide
Fusion ICP OES / ICP MS (SGS code ICM90A). Elements
analyzed at ppm levels:
Al 100 – 250,000 Dy 0.05 – 1,000
Ce 0.1 – 10,000 Eu 0.05 – 1,000
Er 0.05 – 1,000 Gd 0.05 – 1,000
Ga 1 – 1,000 Ho 0.05 – 1,000
La 0.1 – 10,000 Li 10 – 15,000
Nd 0.1 – 10,000 Pr 0.05 – 1,000
Sm 0.1 – 1,000 Tb 0.05 – 1,000
Th 0.1 – 1,000 Tm 0.05 – 1,000
U 0.05 – 10,000 Y 0.05 – 1,000
Yb 0,1 – 1,000
The sample preparation and assay techniques used
are industry standard and provide total analysis.
The SGS laboratory used for assays is ISO 9001 and
14001 and 17025 accredited.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
Criteria JORC Code explanation Commentary
Verification
of sampling
and assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Apart from the routine QA/QC procedures by the
Company and the laboratory, there was no other
independent or alternative verification of sampling
and assaying procedures.
No twinned holes were used.
Primary data collection follows a structured protocol,
with standardized data entry procedures ensure that
any issues are identified and rectified. All data is
stored both in physical forms, such as hard copies and
electronically, in secure databases with regular
backups.
The adjustments to the data were made transforming
the element values into the oxide values. The
conversion factors used are included in the table
below. (source: https://www.jcu.edu.au/advanced-
analytical-centre/resources/element-to-
stoichiometric-oxide-conversion-factors)
Element ppm Conversion Factor Oxide Form
Al 1.8895 Al2O3
Ce 1.2284 CeO2
Ga 1.3442 Ga2O3
Dy 1.1477 Dy2O3
Er 1.1435 Er2O3
Eu 1.1579 Eu2O3
Ga 1.3442 Ga2O3
Gd 1.1526 Gd2O3
Ho 1.1455 Ho2O3
La 1.1728 La2O3
Lu 1.1371 Lu2O3
Nd 1.1664 Nd2O3
Pr 1.2082 Pr6O11
Sm 1.1596 Sm2O3
Tb 1.1762 Tb4O7
Tm 1.1421 Tm2O3
Y 1.2699 Y2O3
Yb 1.1387 Yb2O3
Rare earth oxide is the industry accepted form for
reporting rare earths. The following calculations are
used for compiling REO into their reporting and
evaluation groups:
TREO (Total Rare Earth Oxide) = La2O3 + CeO2 +
Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7
+ Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 + Yb2O3 + Y2O3 +
Lu2O3
LREO (Light Rare Earth Oxide) = La2O3 + CeO2 +
Pr6O11 + Nd2O3
HREO (Heavy Rare Earth Oxide) = Sm2O3 + Eu2O3 +
Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 +
Yb2O3 + Y2O3 + Lu2O3
CREO (Critical Rare Earth Oxide) = Nd2O3 + Eu2O3 +
Tb4O7 + Dy2O3 + Y2O3
(From U.S. Department of Energy, Critical Material
Strategy, December 2011)
MREO (Magnetic Rare Earth Oxide) = Nd2O3 + Pr6O11
+ Tb4O7 + Dy2O3
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
Criteria JORC Code explanation Commentary
NdPr = Nd2O3 + Pr6O11
DyTb = Dy2O3 + Tb4O7
In elemental from the classifications are:
TREE:
La+Ce+Pr+Nd+Sm+Eu+Gd+Tb+Dy+Ho+Er+Tm+Tb+Lu+Y
HREE: Sm+Eu+Gd+Tb+Dy+Ho+Er+Tm+Tb+Lu+Y
CREE: Nd+Eu+Tb+Dy+Y
LREE: La+Ce+Pr+Nd
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
The UTM SIRGAS2000 zone 24S grid datum is used for
current reporting. The auger collar coordinates for the
holes reported are currently controlled by hand-held
GPS.
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
Collar plan displayed in the body of the release.
No resources are reported.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
All drill holes were drilled vertically, which is
deemed the most suitable orientation for this
type of supergene deposit. These deposits
typically have a broad horizontal extent relative
to the thickness of the mineralised body,
exhibiting horizontal continuity with minimal
variation in thickness.
Given the extensive lateral spread and uniform
thickness of the deposit, vertical drilling is
optimal for achieving unbiased sampling. This
orientation allows for consistent intersections of
the horizontal mineralised zones, providing an
accurate depiction of the geological framework
and mineralisation.
No evidence suggests that the vertical orientation
has introduced any sampling bias concerning the
key mineralised structures. The alignment of the
drilling with the deposit's known geology ensures
accurate and representative sampling. Any
potential bias from the drilling orientation is
considered negligible.
Sample
security
• The measures taken to ensure sample
security.
All samples were collected by field personnel and
securely sealed in labeled plastic bags to ensure
proper identification and prevent contamination. All
samples for submission to the lab are packed in
plastic bags (in batches) and sent to the lab where it
is processed as reported above.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
Criteria JORC Code explanation Commentary
The transport from the Pimenta Project to the SGS
laboratory in Vespasiano MG was undertaken by a
competent, independent contractor.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
No independent audit has been completed.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership, including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time of
reporting along with any known
impediments to obtaining a licence to
operate in the area.
All auger holes were drilled from the below tenement
70% owned by Verity Resources Pty Ltd via a joint
venture agreement with Foxfire Metals Pty Ltd.
830.379/2024, 830.381/2024, 830.382/2024,
830.385/2024, 830.386/2024, 830.387/2024,
830.388/2024, 830.389/2024, 830.391/2024,
830.392/2024, 830.393/2024, 830.394/2024,
830.395/2024, 830.396/2024, 830.397/2024,
870.268/2024
Area: 30,075.34 hectares
Status: Exploration Licence.
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration
• by other parties.
No known exploration for REE has been carried out
on the exploration licences area. No known
exploration for other minerals is known over the
licences area.
Geology • Deposit type, geological setting and style of
mineralisation.
The Pimenta Project hosts a granitic allanite-type REE
mineralisation style, with mineralisation occurring
both in weathered regolith (soil and saprolite) and in
the fresh granite bedrock. The REEs are interpreted
primarily hosted in allanite, a resistant mineral
enriched in light rare earth elements (LREEs). The
mineralisation style is residual, with geochemical
continuity from fresh rock to weathered zones,
indicating enrichment without significant REE
mobility.
The geological setting comprises coarse-grained,
porphyritic biotite granites of Mesoproterozoic age,
part of the Santo Antonio do Jacinto Granite
Complex in northern Minas Gerais, Brazil. These
granites host primary REE-bearing minerals,
predominantly allanite, often associated with zircon,
thorite and magnetite, within a structurally coherent
and foliated intrusive body. The mineralization style
is characterized by residual enrichment of TREO
within the saprolite and soil horizon, developed
through deep weathering of the host granite.
Drill hole
Information
• A summary of all information material to
the understanding of the exploration results,
including a tabulation of the following
information for all Material drill holes:
o Easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
Reported in the body of the announcement.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
the drill hole collar
o Dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Data has been aggregated according to downhole
intercept lengths above the lower cut-off grade.
A lower cut-off grade of 50 g/t Ga2O3 has been
applied using a minimum composite length of 5
meters and maximum 1 meter internal dilution.
A lower cut-off grade of 1,000 ppm TREO has been
applied using a minimum composite length of 1 meter
and no internal dilution.
Data acquisition for this project encompasses results
from auger holes. The dataset was compiled in its
entirety, with no selective exclusion of information.
All analytical techniques and data aggregation were
conducted in strict accordance with industry best
practices, as outlined in prior technical discussions.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
All holes are vertical, and mineralisation is developed
in a flat-lying residual soil, saprolite and transition
zone within the regolith.
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Reported in the body of the text.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
The data presented in this report aims to provide a
transparent and comprehensive overview of the
exploration activities and findings. All relevant
information, including sampling techniques,
geological context, prior exploration work, and assay
results, has been thoroughly documented.
Cross-references to previous announcements have
been included where applicable to ensure continuity
and clarity. The use of diagrams, such as geological
maps and tables, is intended to enhance
understanding of the data.
This report accurately reflects the exploration
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL
ACN 122 995 073
activities and findings without bias or omission.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
There is no additional substantive exploration data to
report currently.
Further work • The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
The planned next stage of work involves
mineralogical characterisation, metallurgical
testwork and auger drilling to support ongoing
resource evaluation.
Appendix A – Drill Hole Information
HoleID Hole Type Easting Northing RL Depth Azimuth Dip
PMT-AUG-001 Auger 373,037.77 8,175,956.65 415.47 5.00 0 -90
PMT-AUG-002 Auger 372,655.00 8,176,282.00 486.00 6.00 0 -90
PMT-AUG-003 Auger 372,462.67 8,176,470.62 498.88 8.00 0 -90
PMT-AUG-004 Auger 372,900.35 8,177,102.32 485.65 3.00 0 -90
PMT-AUG-005 Auger 373,497.32 8,177,483.46 472.33 3.00 0 -90
PMT-AUG-006 Auger 373,895.37 8,178,037.35 521.13 3.50 0 -90
PMT-AUG-007 Auger 373,319.19 8,178,020.70 538.23 3.00 0 -90
PMT-AUG-008 Auger 372,500.69 8,177,458.67 304.92 3.00 0 -90
PMT-AUG-009 Auger 373,541.66 8,178,478.18 488.85 5.00 0 -90
PMT-AUG-010 Auger 372,321.77 8,178,828.82 611.56 7.60 0 -90
PMT-AUG-011 Auger 373,307.26 8,180,325.88 417.49 4.00 0 -90
PMT-AUG-012 Auger 374,389.07 8,182,671.51 663.89 3.00 0 -90
PMT-AUG-013 Auger 372,344.81 8,182,354.38 339.23 8.00 0 -90
PMT-AUG-014 Auger 373,256.88 8,184,346.45 566.65 5.00 0 -
Share your feedback
Discover