137,700oz
Monument gold resource (JORC 2012)
405km²
100% owned, granted ground
Three Jurisdictions
three supply-critical projects
What we have done, and what we are doing now.
-
SEP 2025
Historic drill data validated at Korong
Re-assay and validation of historic drilling confirmed high-grade zones ahead of the resource upgrade program, allowing 16,000m of legacy data to be combined with new drilling in the estimate.
-
OCT 2025
Up to 38g/t gold from Phase 1 infill drilling
54 RC holes for 3,630m at Korong returned consistent intercepts above 1g/t, headed by 7.7m at 6.37g/t from 78m including 1m at 38.0g/t (KORC25016), 3.9m at 6.35g/t from 96m including 1m at 15.3g/t (KORC25023), and 4.8m at 2.79g/t from 76m including 1m at 11.3g/t.
-
OCT 2025
100% ownership of the Botswana copper-silver portfolio
Acquisition of BCL's remaining joint venture interest gave Verity outright ownership of the Airstrip and Dibete copper-silver prospects and the Maibele North nickel-copper-PGE resource across the Limpopo Mobile Belt.
-
OCT 2025
20km REE trend confirmed at Pimenta, Brazil
A maiden 38-hole auger program returned rare earth mineralisation from surface across a trend of more than 20km, with magnet rare earth oxides making up 24–28% of contained oxide and peak surface sampling at 2.58% TREO.
-
JAN 2026
New tenement grant doubles the Monument landholding
A single grant took Monument from roughly 195km² to about 405km², adding an entirely new front of ground that was vacant and largely unexplored.
-
JAN 2026
92.75% average gold recovery at Korong
Four composites above 340RL, each diluted with waste to simulate open-pit mining, averaged 92.75% recovery, with best-case high-grade fresh rock at 98.1%. Reagent consumption was low across all composites.
-
JAN 2026
Up to 21.3g/t gold from step-out drilling at Waihi
Phase 2 assays confirmed mineralisation continues beyond the resource boundary, including 3.2m at 5.27g/t with 0.8m at 21.3g/t. Waihi's infill grade of 2.1g/t Au ran 50% above the then-global resource grade.
-
MAR 2026
11,000m resource upgrade program completed
The final batch of assays closed out a campaign of infill and step-out RC and diamond drilling across Korong and Waihi at 25m by 25m spacing — the density required to support a confidence upgrade. Final holes included 2.4m at 5.41g/t and 3.2m at 4.14g/t at Waihi.
-
MAR 2026
Step-out drilling doubles mineralised strike over both deposits
Confirmed mineralised strike at Korong extended from 900m to more than 1,400m, and at Waihi from 150m to over 800m, with grade maintained at shallow depths outside the resource boundary.
-
MAY 2026
Maiden Indicated Mineral Resource
The updated estimate delivered 2.5Mt at 1.72g/t Au for 137,700 ounces, of which 1.18Mt at 1.75g/t for 66,200 ounces — 48% — sits in the Indicated category. 57,000 of those Indicated ounces fall inside an optimised open pit shell. The first ounces at Monument capable of supporting a mining study.
-
JUN 2026
97% gold recovery at Waihi
Testwork returned 96.99% from saprock and 96.67% from fresh BIF-hosted sulphide inside 24 hours, with roughly 29% gravity-recoverable gold in both. Same methodology and laboratory as Korong — the two deposits share a common recovery profile and a single conventional flowsheet.
-
JUN 2026
Ground exploration re-commences in Botswana
Fieldwork restarted across the 100%-owned portfolio, with approximately 200 soil samples and mapping on PL123/2024, ahead of ground geophysics over priority anomalies and planned pitting and bulk sampling at Airstrip, Dibete and Maibele North.
-
JUL 2026
New intrusion-related gold target at Gum Well
Soil sampling on the newly granted ground defined a 1.1km coherent gold-in-soil anomaly to 64ppb Au, coincident with a discrete magnetic feature interpreted as a high-level intrusive and outcropping rock chips at 779ppm Cu and 1.2ppm Te — ten times background. Intrusion-related gold is the highest-value style in the Laverton district, with Genesis Minerals' Jupiter deposit (~1.5Moz Au) demonstrating the scale this setting can deliver.
-
JUL 2026
Gold confirmed along a 9km BIF corridor
58 aircore holes for 2,622m returned gold in 19 of 24 holes at the A4 and A1 prospects. Selected first-pass results from shallow, widely spaced drilling, outside any existing resource — with the balance of the 20km corridor still to be adequately tested.
-
IN PROGRESS
A scoping study, processing options and a mining licence
All three are underway: study work on staged development, discussions on treating our ore through an established regional mill, and a mining licence application that is lodged and pending.