DoM Approves Copper-Silver Exploration Pits, Botswana
Released
Released
Announcement PDF
ASX Announcement
Stay in the loop
Submit questionsand stay up to date
on shareholder news, reports, and
presentations
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
Department of Mines Approves Exploration Pits at Airstrip and Dibete
Copper-Silver Prospects
Verity Resources Limited (ASX: VRL, FSE: 48B0) (Verity or the Company) is pleased to advise that its wholly
owned Botswana subsidiary, African Metals (Pty) Ltd, has received approval from the Botswana Department
of Mines to excavate exploration pits at the Airstrip and Dibete copper-silver prospects in eastern Botswana.
The pits form part of the exploration pitting and bulk sampling program foreshadowed in the Company's
announcement of 25 May 20261. Verity holds a 100% interest in the 2,868km² Botswana portfolio following
completion of the acquisition of BCL Investments' joint venture interest in December 20252.
Director, Patrick Volpe, commented:
“Approval to open the first exploration pits at Airstrip and Dibete is an important practical step for
our Botswana copper-silver portfolio. For the first time we will expect to see the near-surface
mineralisation exposed in the walls and floor of a pit, rather than inferred from drill holes, and map
the structures that control the high-grade shoots.
Just as importantly, the pits give us enough material to run proper metallurgical testwork on the
1 ASX Release 25 May 2026, “Botswana Critical Metals Portfolio Exploration Update”.
2 ASX Release 3 December 2025, “Strategic Acquisition to 100% Ownership of Copper-Silver Assets Complete”.
HIGHLIGHTS
• Verity's wholly owned subsidiary, African Metals (Pty) Ltd, has received approval from the Botswana
Department of Mines to excavate exploration pits at the Airstrip and Dibete copper-silver prospects
in eastern Botswana
• The shallow (10m) pits are designed to expose the near-surface oxide and supergene copper-silver
mineralisation outlined by previous drilling, trenching and historical workings
• Two initial pits are proposed to be excavated that will allow detailed mapping and sampling of the
structures that control the high-grade shoots, and will provide up to approximately 100 tonnes of
oxidised material for metallurgical testwork
• The proposed Airstrip C6 pit sits directly above previously reported drilling on the C6 shoot,
including 11m @ 7.63% Cu, 462g/t Ag from 52m (ACRC003), including 3m @ 22.74% Cu, 1,379g/t
Ag
• The proposed Dibete pit covers historical copper workings and previously reported drilling collared
within the pit footprint, including 10m @ 2.04% Cu, 15.6g/t Ag from 7m (DBRC133) and 25m @
2.17% Cu, 77g/t Ag from 27m (DBRC124)
• The field team have commenced defining the final pit coordinates followed by excavation to begin
once a contractor is appointed
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
oxide and supergene copper at both prospects. Understanding how that material responds to
processing is a key input to deciding the next phase of work. The program is low-cost and targeted,
and we look forward to getting back on the ground in Botswana.”
Figure 1: VRL tenement portfolio in eastern Botswana showing the location of the Airstrip and Dibete copper-silver
prospects. Intercepts shown were previously reported (refer to Appendix 1).
Department of Mines Approval and Exploration Pit Program
The approval allows the Company to excavate exploration pits at each prospect, following submission of a pit
design report to the Botswana Department of Mines. Airstrip and Dibete lie approximately 6.5km apart along
the Magogophate Shear Zone in the Limpopo Mobile Belt. At both prospects, previous drilling, trenching and
mapping have outlined copper oxide (malachite) and supergene (chalcocite) mineralisation from or near
surface, above primary sulphide mineralisation at depth.
The pits are exploration pits, not production pits. Their purpose is to:
1. expose the near-surface mineralisation and its contacts with the host and country rocks for detailed
geological mapping and structural interpretation;
2. allow systematic channel and bench sampling to compare with nearby drill results; and
3. provide bulk samples of oxidised material for metallurgical and mineralogical testwork.
Each pit will be excavated from the top down in two 5m benches by a local earthmoving contractor using an
excavator and articulated dump truck. Excavated material will be stockpiled at least 5m from the pit edge, with
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
mineralised material from each bench kept separate and waste stockpiled for later rehabilitation. Each pit and
its stockpiles will be fenced. The pit walls and floor will be geologically logged and sampled, with samples
submitted to accredited laboratory SGS South Africa for analysis.
Airstrip Prospect – C6 Pit
The C6 pit is the priority 1 pit. It is positioned across electromagnetic conductor C63, directly above the high-
grade, bornite-bearing copper-silver shoot intersected in previous drilling. Within the pit footprint, surface
mapping and trenching have recorded gossan and copper oxide mineralisation. Drill hole ACRC003 is collared
inside the pit outline, and ACRD029 and ACRD033 intersect the C6 shoot beneath it (Figure 2).
Previously reported drilling at Airstrip has demonstrated a high-grade, vein-hosted copper-silver system,
including:
• 11m @ 7.63% Cu, 462g/t Ag from 52m (ACRC003) – including 3m @ 22.74% Cu, 1,379g/t Ag4
• 18m @ 1.72% Cu, 27.5g/t Ag from 42m (ACRC122) – including 3m @ 8.39% Cu, 136.2g/t Ag5
• 1.13m @ 21.58% Cu, 1,023g/t Ag from 65m (ACRD029) – including 0.25m @ 60.98% Cu, 2,833g/t
Ag6
• 0.6m @ 25.27% Cu, 1,283g/t Ag from 64m (ACRD033) – including 0.24m @ 49.06% Cu, 2,493g/t Ag7
The initial drilling program at Airstrip intersected anomalous secondary copper close to surface in most holes,
with malachite hosted in sheared gneiss and overlying alluvium. Earlier trenching over a 650m strike length
exposed visible copper carbonates over 150m, up to 16m wide8.
The high-grade intercepts above lie below the 10m pit floor and will not be tested directly by the pit. The pit
will expose the near-surface oxidised part of the C6 shoot, allowing the geometry and controls of the
mineralisation to be mapped in the pit walls and providing oxide material for testwork.
3
ASX Release 27 October 2011, “Drilling at Airstrip on IP Conductors confirms additional Copper-Silver mineralization”.
4
ASX Release 22 September 2010, “Update Drilling on Airstrip Copper and Dibete Prospects”.
5 ASX Release 1 March 2012, “Drilling at Airstrip on IP Conductors Finds New High Grade Copper-Silver zone”.
6 ASX Release 5 November 2010, “More exceptional high grade Cu and Ag results at Airstrip”.
7 ASX Release 5 November 2010, “More exceptional high grade Cu and Ag results at Airstrip”.
8
ASX Release 3 February 2010, “Drilling at Airstrip Copper Anomaly in Botswana: Intersection of 4m at 16.99% Copper (Cu) & 1071 g/t (33 ounces p/t) Silver (Ag)
from a down hole depth of 52m”.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 2: Airstrip prospect plan showing the approved C6 exploration pit over the C6 copper-silver shoot, historical
mineralised trenches and gossans, drill holes and previously reported intercepts.
Dibete Prospect – Pit 1
Dibete Pit 1 sits at the north-western end of the Dibete supergene copper-silver zone, where oxide copper
mineralisation reaches surface and coincides with historical copper workings and exploration trenches (Figure
3).
At Dibete, copper oxide minerals (malachite, azurite and chrysocolla) typically extend to about 35m below
surface, with supergene enrichment mostly between 18m and 35m and a supergene sulphide (chalcocite)
transition below9. Previously reported results from within and adjacent to the pit footprint include:
• 10m @ 2.04% Cu, 15.6g/t Ag from 7m (DBRC133)10
• 25m @ 2.17% Cu, 77g/t Ag from 27m (DBRC124)11
• 8m @ 0.62% Cu, 28.3g/t Ag at surface in trench DBT001 (82–90m along the trench)12
• 36m @ 1.37% Cu, 70g/t Ag from 12m (DBRD117) – including 2.5m @ 7.41% Cu, 456g/t Ag13
9
ASX Release 19 July 2011, “Dibete drilling intercepts significant mineralisation”.
10 ASX Release 18 December 2017, “Drill Results from Dibete Prospect in Botswana”.
11 ASX Release 16 November 2017, “Thick High-Grade Copper and Silver – Initial Holes at Dibete”.
12 ASX Release 28 November 2023, “Drilling Hits 13% Copper and 281g/t Silver at Dibete, Botswana”.
13
ASX Release 16 April 2012, “Dibete drilling confirms additional High-Grade Copper-Silver of up to 15.5% Copper and 1220 g/t Silver (or over 30 ounces/t Ag)
from 30m”.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
• 38m @ 1.72% Cu, 119.5g/t Ag from 16m (DBRC014)14
• 6.15m @ 7.20% Cu, 182g/t Ag from 24.85m (DBRD149) – including 1m @ 13.0% Cu, 168g/t Ag15
As at Airstrip, most of these intercepts lie below the 10m pit floor (Figure 4). Pit 1 is targeted to expose the
near-surface oxide part of the system and provide oxide material for testwork.
Figure 3: Dibete prospect plan showing the approved Pit 1, ancient copper workings, drill holes and previously reported
intercepts, with the interpreted extent of near-surface supergene copper. Section line A–A' is shown in Figure 4.
14
ASX Release 28 November 2023, “Drilling Hits 13% Copper and 281g/t Silver at Dibete, Botswana”.
15 ASX Release 28 November 2023, “Drilling Hits 13% Copper and 281g/t Silver at Dibete, Botswana”.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 4: Dibete long section A–A' (looking north-east, no vertical exaggeration) showing downhole copper, the interpreted
supergene copper zone and weathering profile, and the profile of the approved Pit 1.
Bulk Sampling and Metallurgical Testwork
Up to approximately 100 tonnes of oxidised mineralised material will be collected from the two pits, packed in
1-tonne bulk bags and shipped to selected laboratories in South Africa and Australia. Shipment requires a
sample export permit from the Department of Mines, which the Company will apply for once the pits are
opened.
The testwork program is designed to characterise the near-surface weathered material and will include:
• crushing, pulverising and particle size distribution analysis;
• chemical analysis for copper, silver and other base metals by ICP-MS;
• mineralogy by quantitative XRD and petrography; and
• extraction and recovery testwork using conventional and newer processing methods.
The testwork is at an early stage and results are intended to guide further exploration and technical work and
should not be taken as an indication of the economic potential of the prospects.
Next Steps
1. Appoint the earthmoving contractor and mobilise to site.
2. Excavate the proposed pits.
3. Map, log and sample the pit walls and floors, and report results to the market in accordance with the
JORC Code (2012).
4. Apply for the sample export permit and ship bulk samples for testwork.
5. Progressively rehabilitate the pits in line with Department of Mines guidelines once sampling is
complete.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
This announcement has been authorised for release by the Board of Verity Resources Limited.
For further information, please contact:
Verity Resources Limited
info@verityresources.com.au
About Verity Resources
Verity Resources is an ASX-listed explorer building a portfolio of gold and critical metals assets across Western Australia, Botswana
and Brazil.
The Company owns 100% of the Monument Gold Project near Laverton in Western Australia, which hosts a JORC (2012) Mineral
Resource Estimate of 2.5Mt @ 1.72g/t Au for 137,700oz, comprising 1.18Mt @ 1.75g/t Au for 66,200oz Indicated and 1.32Mt @
1.69g/t Au for 71,500oz Inferred. Monument sits within one of Australia's most productive gold districts, in a region with established
processing infrastructure. Refer to the ASX announcement of 12 May 2026, "Maiden Indicated Resource Declared at Monument Gold
Project", for further information.
In Botswana, Verity holds 100% of a 2,868km² copper-silver and nickel-copper-PGE portfolio in the Limpopo Mobile Belt — a stable,
mining-friendly jurisdiction hosting the Selebi-Phikwe and Musina districts. Drilling at the Airstrip and Dibete prospects has returned
high-grade copper-silver mineralisation. The Maibele North deposit hosts a JORC (2012) Inferred Mineral Resource of 2.4Mt @ 0.72%
Ni and 0.21% Cu, with associated PGEs, cobalt and gold. Refer to the ASX announcement of 28 April 2015 “Maiden Inferred Resource
for Maibele North”, for further information.
In Brazil, Verity holds a critical metals portfolio through joint venture, spanning rare earth elements, lithium, gold, and base and
precious metals, with licences in the "Lithium Valley" and at Poços de Caldas in Minas Gerais. The Company also owns 70% of the
Pimenta Project, a large-scale REE opportunity in eastern Minas Gerais.
Verity Resources InvestorHub
We encourage you to go to our InvestorHub for any enquiries regarding this announcement or other investor news from Verity
Resources. This platform offers an opportunity to submit questions and stay up to date on shareholder news, reports,
presentations and more. To access the Verity Resources InvestorHub visit https://verityresources.com.au/.
Competent Persons Statement (Botswana)
The information in this report that relates to Exploration Results and the Mineral Resource Estimate for the Botswana projects
(Maibele North, Dibete and Airstrip) is based on, and fairly represents, information and supporting documentation compiled by Mr
Paul Lemmon, a Registered Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP)
and the Competent Person appointed by Verity Resources Limited for the Botswana projects. Mr Lemmon has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Lemmon consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
The Maibele North Mineral Resource Estimate was originally prepared by MSA Group and is extracted from the ASX announcement
dated 28 April 2015 “Maiden Inferred Resource for Maibele North”, available at www.verityresources.com.au. The Company confirms
that it is not aware of any new information or data that materially affects the information included in that announcement, and that
all material assumptions and technical parameters underpinning the estimate in that announcement continue to apply and have not
materially changed, and that the form and context in which the Competent Person's findings are presented have not been materially
modified from the original market announcement.
Previously Reported Information
This announcement contains no new Exploration Results. The Exploration Results referred to in this announcement were originally
reported in the ASX announcements referenced in the footnotes, in Appendix 1 and in the Reference to Previous Announcements
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
below. In relying on those announcements and pursuant to ASX Listing Rule 5.23, the Company confirms that it is not aware of any
new information or data that materially affects the information included in those announcements, and that the form and context in
which the Competent Person's findings are presented have not been materially modified from the original market announcements.
Certain Airstrip and Dibete results were first reported under the 2004 Edition of the JORC Code and have not been updated to comply
with the 2012 Edition, on the basis that the information has not materially changed since it was last reported. The source of all data
and results has been referenced.
Cautionary Statement
The exploration pits and bulk sampling described in this announcement are exploration activities. No Mineral Resource or Ore Reserve
has been estimated for the Airstrip or Dibete prospects, and the Company has not made a decision to mine. Material excavated from
the pits is for geological, sampling and testwork purposes only. The interpreted supergene copper zone and weathering profile shown
in Figures 3 and 4 are geological interpretations based on drill logging and assay data and are not estimates of Mineral Resources.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s mineral properties, planned exploration program(s) and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may,” "potential," "should," and
similar expressions are forward looking statements. All such statements are subject to certain risks and uncertainties, many of
which are difficult to predict and generally beyond the control of the Company, which could cause actual results to differ materially
from those expressed in, or implied or projected by, the forward-looking information and statements. Our audience is cautioned
not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or
to reflect the occurrence of or non-occurrence of any events.
Reference to Previous Announcements
• ASX Release 26 August 2026 “Botswana Prospecting Licences Renewed Over Copper-Silver Projects”
• ASX Release 25 May 2026 “Botswana Critical Metals Portfolio Exploration Update”
• ASX Release 12 May 2026 “Maiden Indicated Resource Declared at Monument Gold Project”
• ASX Release 3 December 2025 “Strategic Acquisition to 100% Ownership of Copper-Silver Assets Complete”
• ASX Release 13 October 2025 “Verity Takes 100% Ownership of Copper-Silver JV Projects”
• ASX Release 28 November 2023 “Drilling Hits 13% Copper and 281g/t Silver at Dibete, Botswana”
• ASX Release 18 December 2017 “Drill Results from Dibete Prospect in Botswana”
• ASX Release 16 November 2017 “Thick High-Grade Copper and Silver – Initial Holes at Dibete”
• ASX Release 28 April 2015 “Maiden Inferred Resource for Maibele North”
• ASX Release 16 April 2012 “Dibete drilling confirms additional High-Grade Copper-Silver of up to 15.5% Copper and 1220
g/t Silver (or over 30 ounces/t Ag) from 30m”
• ASX Release 1 March 2012 “Drilling at Airstrip on IP Conductors Finds New High Grade Copper-Silver zone”
• ASX Release 27 October 2011 “Drilling at Airstrip on IP Conductors confirms additional Copper-Silver mineralization”
• ASX Release 19 July 2011 “Dibete drilling intercepts significant mineralisation”
• ASX Release 5 November 2010 “More exceptional high grade Cu and Ag results at Airstrip”
• ASX Release 22 September 2010 “Update Drilling on Airstrip Copper and Dibete Prospects”
• ASX Release 3 February 2010 “Drilling at Airstrip Copper Anomaly in Botswana: Intersection of 4m at 16.99% Copper
(Cu) & 1071 g/t (33 ounces p/t) Silver (Ag) from a down hole depth of 52m”
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Appendix 1: Previously Reported Exploration Results Referred to in this Announcement
Intervals are downhole widths; true widths are not known. Intercepts were calculated using the cut-off grades and internal dilution
stated in the original announcements. Coordinates are WGS84 UTM Zone 35S. Collar RLs are nominal and are not shown.
Table 1: Significant historical intercepts
Prospect
Hole /
trench
From
(m)
Interval
(m)
Cu
(%)
Ag (g/t) Including Original ASX release
Airstrip ACRC003 52 11 7.63 462 3m @ 22.74% Cu, 1,379g/t Ag 22 Sep 2010
Airstrip ACRC122 42 18 1.72 27.5 3m @ 8.39% Cu, 136.2g/t Ag 1 Mar 2012
Airstrip ACRD029 65 1.13 21.58 1,023 0.25m @ 60.98% Cu, 2,833g/t Ag 5 Nov 2010
Airstrip ACRD033 64 0.6 25.27 1,283 0.24m @ 49.06% Cu, 2,493g/t Ag 5 Nov 2010
Dibete DBRC133 7 10 2.04 15.6 – 18 Dec 2017
Dibete DBRC124 27 25 2.17 77 – 16 Nov 2017
Dibete
DBT001
(trench)
82
(along
trench)
8 0.62 28.3 – 28 Nov 2023
Dibete DBRD117 12 36 1.37 70 2.5m @ 7.41% Cu, 456g/t Ag 16 Apr 2012
Dibete DBRC014 16 38 1.72 119.5 – 28 Nov 2023 (restated)
Dibete DBRD149 24.85 6.15 7.20 182
1m @ 13.0% Cu, 168g/t Ag from
29m
28 Nov 2023
Table 2: Collar details
Hole / trench Type Easting (mE) Northing (mN) Dip (°) Azimuth (°) Depth / length (m)
ACRC003 RC 631,665 7,595,120 -60 060 80.0
ACRC122 RC 631,404 7,594,915 -60 325 150.0
ACRD029 RC/DD 631,700 7,595,100 -60 330 100.4
ACRD033 RC/DD 631,689 7,595,094 -60 325 89.4
DBRC133 RC 638,148 7,593,943 -60 045 40.0
DBRC124 RC 638,179 7,593,903 -60 137 70.0
DBT001 Trench 638,192 7,593,877 0 326 112.0
DBRD117 RC/DD 638,217 7,593,851 -60 330 69.1
DBRC014 RC 638,214 7,593,858 -70 330 110.0
DBRD149 RC/DD 638,190 7,593,849 -60 044 149.5
https://verityresources.com.au/link/y0Vgnr
Share your feedback
Discover