Historical Drill Validation Confirms High Gold Grade Zones
Released
Released
Announcement PDF
ASX Announcement
Historical Drill Validation Study Confirms High Grade
Zones at Monument Gold Project
HIGHLIGHTS
HISTORICAL DRILL DATA REVIEW AND VALIDATION COMPLETED
•
Validation program over 16,000m of historical drilling completed at the Korong-Waihi 3.3Mt @
1.4g/t Au (154koz contained gold) Mineral Resource Estimate at the Monument Gold Project,
Laverton WA
•
Previous drilling was completed at Monument by Carpentaria Exploration, Dominion, WMC
Exploration, and Syndicated Metals (now Latitude 66 ASX:LAT)
•
Re-validation of these legacy datasets has standardised results to consistent geological context and
true widths (See JORC Table 1) and confirmed high grade, thick intercepts, supporting continuity
across the Banded Iron Formation (BIF) lodes forming the Korong and Waihi deposits
•
Pending assays from Verity’s phase one resource upgrade RC infill drill program will be reported in
true widths and in the context of these historical results
HIGH GRADE INTERCEPTS VALIDATED AND REPORTED TO JORC (2012) CODE INCLUDE:
Korong (139koz Au Resource):
Waihi (15koz Au Resource):
•
6.7m @ 13.15 g/t Au (MRC036 from 95m)
•
2.70m @ 5.71 g/t (WHRC005 from 62m)
•
5.90m @ 7.24 g/t (MRC003 from 79m)
•
2.10m @ 2.45 g/t (WHRC010 from 113m)
•
2.90m @ 5.41 g/t (MRC028 from 112m)
•
0.50m @ 10.82 g/t (MK033 from 91m)
•
3.00m @ 3.52 g/t (MRCD004 from 139m)
•
4.20m @ 3.55 g/t (WASC03 from 29m)
•
3.90m @ 3.16 g/t (MRC042 from 48m)
•
4.9m @ 1.53 g/t (WAC06 from 56m)
•
3.00m @ 3.09 g/t (MRC039 from 104m)
•
2.80m @ 4.82 g/t (MK032 from 36m)
•
4.70m @ 3.15 g/t (KORC001 from 95m)
•
3.70m @ 3.07 g/t (KORC002 from 130m)
•
2.10m @ 6.58 g/t (MK042 from 263m)
•
3.30m @ 5.12 g/t (MK012 from 104m)
•
11.80m @ 1.85 g/t (MK034 from 30m)
Verity Resources Limited (ASX: VRL, FSE: 48B0) (Verity or the Company) is pleased to announce that is has
completed a comprehensive review and validation of historical drilling of the Korong-Waihi 3.3Mt @ 1.4g/t Au
(154koz Au) Inferred Mineral Resource Estimate at the 100%-owned Monument Gold Project in the prolific
Laverton Goldfields, Western Australia.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
The study was undertaken over historic drilling data previously completed by several companies including
Carpentaria Exploration, Dominion, WMC Exploration and various other smaller operators since the 1970’s
prior to its acquisition and further exploration completed by Syndicated Metals/DiscovEx (now Latitude 66
ASX:LAT) in 2016.
This work brings these legacy datasets - some collected prior to the adoption of the JORC Code (2012) - into a
consistent reporting framework with intercepts recalculated and presented as true widths within a clearly
defined geological context. The validation concludes an intensive compilation and audit phase recently
announced by the Company and provides a robust foundation for the completed phase one and planned phase
two resource upgrade and expansion drilling and mine planning studies.
Verity Director, Patrick Volpe commented,
“Our geological team has completed a rigorous validation of over 16,000m of historical drilling at
Monument, drawing on over 50 years of successful exploration by Carpentaria, Dominion, WMC
and others, now standardised to JORC 2012 true widths. This study is a significant milestone in our
resource upgrade and expansion strategy because it prioritises the parts of the 154koz Korong–
Waihi resource that can deliver the highest returns.
With the recent successful $3 million raise, we are fully funded to execute. Phase-one RC infill drilling
at Korong is complete with assays pending as we target a portion of the current 154koz Inferred
resource to upgrade to Indicated. The opportunity is larger and we see multiple growth corridors
along the 20km BIF trend with numerous expansion targets still to test. Validated high-grade, thick
intercepts give us confidence that our methodical approach to resource upgrades and discovery are
achievable from here.”
Historical Data Validation
The purpose of the program was to review and standardise older drilling that had not previously been reported
to JORC (2012) standard. All “low-confidence” intercepts were removed and the remaining intercepts are
included and are now reported to JORC Code (2012) standards as true widths within the current geological
model at Korong (See Table 1).
The validated results confirm strong mineralisation with high-grade and meaningful thicknesses that support
continuity of the banded iron formation host and underpin the next phase of resource work. Notable examples
at Korong include 6.70m at 13.15 g/t gold in hole MRC036 and 5.90m at 7.24 g/t gold in hole MRC003, together
with a suite of consistent intercepts across the lode from both modern and legacy programs that met the
inclusion threshold.
A JORC Code (2012) Table 1 is annexed to this release and sets out the sampling, survey and verification steps
used.
Phase One Infill Drilling Complete
In parallel with the validation, the Company has completed the first phase of RC infill drilling at Korong on
approximately 25m by 25m spacings, designed to upgrade a portion of the current Korong Inferred resource
to Indicated confidence. Assays from this program are pending and will be released once received and verified
against the validated dataset.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Follow-up programs will target extensions along strike and at depth and will incorporate additional twin holes
to validate the historical drilling where applicable.
Figure 1. Long section view of recently completed drilling and validated historical intercepts looking from the hanging wall down
onto the mineralised Banded Iron Formation (BIF) horizon (red outline). Outline of the current 154koz Au Inferred Resource is
shown (black).
Representative Cross Sections
The following cross sections pass through the middle of the Korong and Waihi deposits and are
representative of the mineralisation style.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Korong
Figure 2. Representative cross section through the core of the Korong mineralisation showing the BIF main mineralised lode.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Figure 3. Representative cross section through the core of the Korong mineralisation showing the BIF main mineralised lode.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Waihi
Figure 4. Representative cross section through the core of the Waihi mineralisation showing the BIF main mineralised lode.
Monument Gold Project
The Monument Gold Project is in WA’s world-class Laverton Gold District and comprises ~195km2 of tenure
located approximately 40km west of Laverton, adjacent and along strike of Genesis Minerals’ (ASX: GMD)
3.3Moz Au Mt Morgan Project. A Mineral Resource Estimate of 154koz of gold (see ASX announcement on 2
August 2021) was undertaken on the Korong and Waihi deposits, which occur along ~20km of relatively
untested banded iron formation, interpreted to be the same unit that hosts the 1.4Moz Westralia gold deposit,
located immediately southeast of Monument.
To date, only ~10% of the potential 20km strike has been drilled with detailed air core and reverse circulation
drilling. There is currently additional priority targets identified along the banded iron formations horizon, that
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
forms part of a 20km potential structural strike length identified that could also potentially host multiple
other syenite-intrusion style targets (in total approximately 60 targets remaining to be tested).
Figure 5. Monument Gold Project location in the Laverton Gold District amongst major gold deposits.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Figure 6. Monument Gold Project location adjacent to Genesis Minerals’ 3.3Moz Mt Morgan Project
This announcement has been authorised for release by the Board of Verity Resources Limited.
For further information, please contact:
Verity Resources Limited
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
About Verity Resources
Verity Resources owns 100% of the Monument Gold project located near Laverton in Western Australia. This project currently has
a JORC-compliant (2012) Inferred resource of 3.257 Mt @ 1.4 g/t for 154,000 ounces Au. (inferred resources calculated by CSA
Global in 2021 to JORC 2012 compliance using a 0.5 g/t cut-off grade; see 2 August 2021 ASX announcement “Mineral Resources
Estimate declared for Monument Gold Project “for further information).
Verity Resources also holds a supply critical metals portfolio via a joint venture that includes rare earth elements, lithium, gold,
base and precious metals in Brazil, including licences in the “Lithium Valley” and Poços de Caldas in the state of Minas Gerais,
globally known as prolific lithium and rare earth elements districts respectively. The Company also owns 70% of the Pimenta
Project, a potential large-scale REE project in eastern Minas Gerais.
Verity Resources also holds large base and precious metals projects in the Limpopo Mobile Belt in Botswana, a district known for
hosting major nickel and copper-producing operations. The Company’s Botswana portfolio contains three flagship projects where
high-grade Cu-Ag (Airstrip and Dibete) and a Maiden JORC Inferred Resource (Maibele North) have been discovered. Maibele
North currently hosts a JORC (2012) inferred resource of 2.4Mt @ 0.72% Ni and 0.21% Cu + PGE’s + Co + Au and is located within
50km of the Selebi-Phikwe mine recently acquired by NASDAQ-listed NexMetals Mining Corp. (NASDAQ:NEXML).
Competent Persons Statement (Monument Gold Project, Western Australia)
The information in this report that relates to Exploration Targets and Exploration Results is based on recent and historical
exploration information compiled by Mr Michael Jackson, who is a Competent Person and a Member of the Australian Institute
of Geoscientists. Mr Jackson is a consultant to Verity Resources Limited. Mr Jackson has sufficient experience that is relevant to
the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for the reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Jackson consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the above announcement. No
material exploration data or results are included in this document that have not previously been released publicly. The source of
all data or results have been referenced.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s mineral properties, planned exploration program(s) and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may,” "potential," "should," and
similar expressions are forward looking statements. All such statements are subject to certain risks and uncertainties, many of
which are difficult to predict and generally beyond the control of the Company, which could cause actual results to differ materially
from those expressed in, or implied or projected by, the forward-looking information and statements. Our audience is cautioned
not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or
to reflect the occurrence of or non-occurrence of any events.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Monument Gold Project, Western Australia, Resource Information
Korong Resource
Deposit
Korong
Waihi
Total
Tonnes
3,034,000
223,000
3,257,000
Grade (g/t)
1.4
2.1
1.4
Au (Oz)
139,000
15,000
154,000
Table 1: Inferred Resource was calculated at Korong and Waihi by CSA Global Pty Ltd in 2021 (see Table 2) using a 0.5g/t cut-off grade. See
ASX announcement on 2 August 2021 “Mineral Resource Estimate Declared for Monument Gold Project”.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from the following Company announcements
released to the ASX:
•
•
•
•
•
•
•
ASX:VRL 15 July 2025 “Resource Upgrade and Expansion Drill Campaign to Commence - Amended”
ASX:VRL 19 December 2022 “Broad, High-Grade Gold Intersected at Monument Gold Project”
ASX:VRL 2 August 2021 “Mineral Resource Estimate Declared For Monument Gold Project”
ASX:VRL, 14 April 2021, “Drilling Extends Shallow, BIF-hosted Gold Mineralisation at Monument Gold Project”
ASX:VRL, 17 March 2021, “RC Drilling Confirms BIF-hosted Gold Mineralisation at Monument Gold Project”
ASX:LAT (Formerly Syndicated Metals Limited), 7 June 2018, “Syndicated on Track For Maiden Gold Resource In WA As
Strong Assay Results Confirm Potential of Monument Project”
ASX:LAT (Formerly Syndicated Metals Limited), 28 November 2016, “Strong Gold Mineralisation Returned From Maiden
Drilling Program At Monument Project, WA“
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
JORC Code, 2012 Edition – Table 1
Appendix A – JORC CODE, 2012 Edition
Section 1 – Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature & quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down hole gamma sondes, or
handheld XRF instruments, etc.).
These examples should not be taken
as limiting the broad meaning of
sampling.
• Include reference to measures taken
to ensure sample representivity & the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to
the Public Report.
• In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(e.g. submarine nodules) may
warrant disclosure of detailed
information.
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) & details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented & if so, by what
method, etc.).If no site visits have
been undertaken indicate why this is
the case.
Commentary
RC samples were split into roughly 3kg subsamples
using a rig-mounted cone or riffle splitter and
collected into calico bags over 1m intervals. The
residual bulk samples are placed in lines of piles on the
ground.
Method of recording & assessing core
& chip sample recoveries & results
assessed.
KORC001-KORC021
For the Verity Resources 2021 (Then called SI6)
drillholes continuous visual monitoring and
•
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Core samples are selected visually based on
observations of alteration and mineralisation and
sampled to contacts or metre intervals as appropriate.
Once samples are marked the core is cut in half
longitudinally with one half taken for assay and the
other half returned to the core tray. Some old the
older generation diamond core may have been
sampled by ¼ core which limits the sample support
and therefore representivity of such samples and this
has been reflected in their classification as validation
Class B for consideration of their input into any future
mineral resource estimates.
Reverse Circulation (RC)
RC drilling from 1981 onward was undertaken using
5¼ to 5¾ inch face sampling bits.
Earlier RC drilling up to 1980 used a crossover
sampling bit.
Diamond Drilling
Holes recorded as diamond holes were drilled with HQ
and NQ diameter drill core.
The MK037-65 series drillholes involved an RC
precollar drilled and sampled in the same way as the
standalone RC drillholes.
Some diamond core was reportedly oriented by the
impact pencil method however no resultant data
remains in a digital format.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
•
•
Logging
•
•
•
Sub-sampling
techniques &
sample
•
Measures taken to maximise sample
recovery & ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery & grade &
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material
Whether core & chip samples have
been geologically & geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies &
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length & percentage of the
relevant intersections logged
If core, whether cut or sawn &
whether quarter, half or all core
taken.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
assessment of sample recoveries was undertaken by
suitably qualified field staff (contract geologist and
senior field assistant).
Where low recoveries or wet samples were identified
these were recorded in the field sample data.
To aid in achieving high recoveries and maintaining a
dry sample a support truck mounted air booster was
used when necessary.
KRC001-KRC009
No recovery data is available
MK001-MK065, MK2-…, MK5-… and WA… RC series
For the Carpenteria Exploration Pty Ltd and WMC
drilling, RC drilling recoveries were monitored visually
by means approximating bag weight to theoretical
weight followed by checking sample loss through
outside return and sampling equipment. Sample
recoveries were recorded on drilling logs. “Wet”
samples were recorded as having lower quality sample
recovery.
Core Recovery was recorded on Drilling logs. Core
recovery was generally >98% except were fractured
ground was recorded on drilling logs.
MRC001-MRC049 and precollars of the MRCD001-007
series
For 2016 & 2018 Syndicated Metals drilling, the cone
split original and duplicate calico samples and the
reject green bag samples were weighed to test for
biases and sample recoveries. The majority of the
check work was undertaken through the main ore
zones.
Diamond Drillholes
For all drill core intervals of sample loss were recorded
as such in the geological logging and reflected in the
assignment of sample intervals.
Relationship between recovery and Grade
•
All samples in mineralised zones are recorded
as good recovery and as such no relationship between
grade and recovery is apparent.
All RC and diamond drillholes have been visually
logged for primary rock type, regolith, alteration and
veining across their entire length. The major
generation of mineralisation is tightly constrained to a
main BIF horizon and a thinner horizon
stratigraphically above it. Logging adequately
captures the position of these target lithologies.
All drilling of all vintages have the original drill logs
available, however only the MRCD00x series drillholes
have core photographs available.
Subsampling
Diamond drill core was sawn and half core taken in
most cases (limited quarter core samples were used).
832 High Street
Kew East VIC 3102
info@verityresources.com.au
preparation
•
•
•
•
•
Quality of assay
data &
laboratory tests
•
•
•
If non-core, whether riffled, tube
sampled, rotary split, etc.& whether
sampled wet or dry.
For all sample types, the nature,
quality & appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
The nature, quality & appropriateness
of the assaying & laboratory
procedures used & whether the
technique is considered partial or
total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make &
model, reading times, calibrations
factors applied & their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
RC samples were split with an in-line cone or riffle
splitter directly off the drill rig.
These industry-standard splitting techniques are
appropriate for the gold mineralisation under
consideration.
QAQC for pre-2016 drilling
All 2016 or later drilling has the original QAQC data
digitally available.
Earlier drill campaigns have only sporadic mentions of
sub sampling techniques and field duplicate/secondhalf sampling employed, but the MK001-MK065, MK2…, MK5-… and WA… series drilling of Carpentaria
Exploration and WMC Exploration required
laboratories to insert certified standards, blanks, and
check replicates as part of their own internal
procedures, which were industry best practice at the
time.
QAQC for MRC series holes
Quality Control (QC) procedures involved the use of
reference material ‐ with blanks and field sample
duplicates.
Field duplicates were submitted to the laboratory at a
rate of 1:50. The duplicates were collected using a
second chute on the cone splitter and collected at the
same time as the original sample.
QAQC for KORCxxx and WHRCxxx series holes:
All RC percussion sample material was passed through
a rig-mounted cyclone with a cone splitter attached to
the base and collected at 1m intervals into prenumbered calico bags.
At the completion of each 6m drill rod the cyclone and
cone splitter were cleaned to avoid contamination.
Duplicate Quality Control (QC) samples were taken
every 60 samples as an identical split in conjunction
with the corresponding original sample.
Appropriateness of sample sizes and grain size
These industry-standard sample sizes are considered
appropriate to the grain size of the material being
sampled.
All 2016 drilling or later is assayed by fire assay with a
30g or larger charge and an AAS finish which is
appropriate for this style of gold mineralisaiton. Some
of the earlier generations of drilling were assayed with
an aqua regia digest, which is considered a near total
digest for most styles of gold mineralisation including
that of this project.
No geophysical tools were used.
Laboratory QAQC for pre-2016 drilling
All 2016 or later drilling has the original QAQC data
digitally available. Earlier drill campaigns have only
sporadic mentions of sub sampling techniques and
832 High Street
Kew East VIC 3102
info@verityresources.com.au
duplicates, external laboratory
checks) & whether acceptable levels
of accuracy (i.e. lack of bias) &
precision have been established.
Verification of
sampling &
assaying
•
•
•
•
Location of data
points
•
•
•
The verification of significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical & electronic)
protocols.
Discuss any adjustment to assay
data.
Accuracy & quality of surveys used to
locate drill holes (collar & down-hole
surveys), trenches, mine workings &
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality & adequacy of topographic
control
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
field duplicate/second-half sampling employed, but
the MK001-MK065, MK2-…, MK5-… and WA… series
drilling of Carpentaria Exploration and WMC
Exploration required laboratories to insert certified
standards, blanks, and check replicates as part of their
own internal procedures, which were industry best
practice at the time.
Laboratory QAQC for MRC series holes
Quality Control (QC) procedures involved the use of
reference material ‐ with blanks and field sample
duplicates.
For the analysis of RC and Percussion samples the
Quality Control (QC) procedures involved the use of
laboratory duplicates and Standards to determine
accuracy and precision. The Standards used were
analysed at a rate of 1 per 25 samples.
Laboratory Duplicates were analysed at a rate of 1 in
10 generally with a repeat bias toward ore grade
(>1.0g/t Au) material
Laboratory QAQC for KORCxxx and WHRCxxx series
holes:
•
Certified reference materials obtained from an
external, independent supplier were inserted every 60
samples.
The exercise to which this table 1 relates was a
verification of mostly previously released exploration
results. Having been completed by a consultancy and
competent person not involved in the original
reporting, this review can be considered an
independent verification.
The drilling campaign just completed and the subject
of this release involves twinning of several of the
drillholes mentioned in this release. Assays are
pending.
Primary assay certificates and digital field files are
available for 2016 drilling and later. All data is
managed digitally by a dedicated geoscience data
management consultancy.
No assay data is adjusted from the original certified
values.
Given the technology available at the time drilling
from 1979 to 2003 has a degree of imprecision in both
collar and downhole surveys. The resultant drill
intercept positions are approximate, but accuracy is
sufficient for the purposes for which it is employed.
2016 drilling and later is located with a hand-held GPS
and recorded in the MGA94 Zone 51 UTM coordinate
system.
Downhole surveys are digitally recorded with a driller
operated north-seeking gyroscopic survey tool.
•
Regional government DEM datasets provide
adequate topographic control in this flat terrain.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Data spacing &
distribution
•
•
•
Orientation of
data in relation
to geological
structure
•
•
Sample security
•
Audits or reviews
•
Data spacing for reporting of
Exploration Results.
Whether the data spacing &
distribution is sufficient to establish
the degree of geological & grade
continuity appropriate for the
Mineral Resource & Ore Reserve
estimation
procedure(s)&classifications applied.
Whether sample compositing has
been applied.
Drilling to date has been at various grid spacings in a
multitude of different drill campaigns of various data
quality and suitability for future resource estimates
resulting in a very sporadic spacing.
Nominally, Korong and Waihi might be considered to
be drilled out at 50m x 50m spacing, but very
inconsistently. The drill program that is the subject of
this release will attain a 25 x 25m intercept spacing on
the target mineralised structures.
It is expected that a 25m x 25m drill spacing will
achieve an indicated resource, subject to final
assessment as part of the MRE process of course.
Samples have not been composited from the raw
samples and assays however composite grades are
reported in this release across the geological context
of a single intercept (see data aggregation methods).
Whether the orientation of sampling
achieves unbiased sampling of
possible structures & the extent to
which this is known, considering the
deposit type.
If the relationship between the
drilling orientation & the orientation
of key mineralised structures is
considered to have introduced a
sampling bias, this should be assessed
& reported if material
The measures taken to ensure sample
security the different materials.
The geometry of the target structure, a BIF horizon, is
very well constrained by geological logging.
That horizon dips moderately at Korong and drillholes
are able to intersect the horizon at near perpendicular
angles.
That horizon dips moderately to steeply at Waihi and
drillholes are able to intersect the horizon at high
angles.
The drill intercept angle does not introduce a sampling
bias.
The results of any audits or reviews of
sampling techniques & data.
This re-release of many previously reported intercepts
and careful consideration of data quality and historical
drilling, sampling and assaying procedures can be
considered a review in that context.
This review compared Class A (fully validated) drill
intercepts against those of Class B (good, but less
certain data). Visual comparison in the geological
context showed no issues or inconsistencies with the
older, less well documented data.
A statistical comparison of individual sample assays
via a Q-Q plot did imply a broader spread of grades in
the older data through a trendline that was not 1:1.
That Q-Q plot implied that the older
Share your feedback