New Gold Induced Polarisation (IP) Target To Be Drilled
at Perseverance Prospect
Verity Resources Limited (ASX: VRL, FSE: 48B0) (Verity or the Company) is pleased to advise positive results
received from the recently completed a Pole-Dipole Induced Polarisation (IP) survey undertaken at the
Perseverance prospect within the Company’s 100% owned Monument Gold Project, Western Australia. The
survey has identified a chargeability high anomaly target which has never been drill tested.
Verity Director, Patrick Volpe, commented,
“The Perseverance IP survey has delivered a compelling, near-surface chargeability target that
aligns with outcropping BIF and earlier rock chip results above 1 g/t gold. Importantly, this
anomaly has never been drilled and sits on the same BIF corridor that hosts our 154koz Korong-
Waihi resource.
With the RC rig already operating on site and approvals in place, we will move quickly to drill test
Perseverance in late November. Success here could open up additional targets along the 20km BIF
trend and provide a low-cost pathway to potentially growing our resource base at Monument.”
The results of the IP geophysical survey undertaken at Perseverance in October 2025 have identified a high
chargeability target across three adjoining survey lines covering a survey area of 500m x 1,200m (Figures 2 and
3).
HIGHLIGHTS
• Induced Polarisation (IP) geophysical survey identified distinct, near-surface chargeability high anomaly
at the Perseverance prospect in the Monument Gold Project, Laverton (Western Australia)
• The IP anomaly is coincident with surface outcrop of banded iron formation (BIF) stratigraphy that
hosts the 154koz Korong-Waihi Inferred Mineral Resource Estimate
• Previous rock chip sampling of the BIF stratigraphy above the chargeability high IP anomaly returned
numerous samples >1g/t Au
• RC drill planning and targeting underway with drill program planned for end of November
• Only ~10% of the ~20km BIF trend systematically drilled to date at the Monument Gold Project - multiple
untested structural and syenite-associated targets remain to be adequately tested
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 1. Location of Perseverance Prospect at Monument Gold Project.
Induced Polarisation Survey and Targeting
The Perseverance IP survey was conducted by Fender Geophysics and the target was selected based on a
distinct magnetic depletion zone along the BIF stratigraphy, approximately 2km along strike of the Waihi
resource (15koz Au). This magnetic depletion zone coincides with anomalous surface rock ship samples grading
>1g/t Au and is interpreted to potentially represent the sulphide replacement of magnetite hosted in the BIF
stratigraphy. This style of sulphide replacement mineralisation also hosts the Korong gold deposit (139koz Au)
along strike 8km southeast of Perseverance.
Three 200m spaced lines were selected oriented northeast-southwest perpendicular to strike and centred over
the BIF stratigraphy where previous rock sampling had returned >1g/t Au (Figures 2 to 4).
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
Results of IP Survey
The survey results were quality controlled and analysed by West Coast Geophysics (WCG) of Perth, Western
Australia. The data quality was regarded as reasonable with bad readings removed prior interpretation.
The resultant quality-controlled data was inverted as 2D lines to produce 2D sections of chargeability and
resistivity. The 200m spaced lines were subsequently input into a 3D inversion algorithm to produce modelled
chargeability and resistivity volumes with the zone of chargeability coinciding with a zone of low resistivity.
The interpretation by WCG indicated that the elevated chargeability volume (20mV/V) is coincident with a
break in the magnetic stratigraphy potentially representing shale, alteration/faulting or elevated sulphides
and represents an orogenic gold target worthy of drill testing.
Figure 2. Location of IP survey lines and surface rock chip sampling Perseverance Prospect, Monument Gold Project.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 3. IP Chargeability and results from Perseverance Prospect at Monument Gold Project and surface rock chip sampling
>1g/t Au.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 4. 3D oblique view of IP Chargeability results at Perseverance looking north.
Further Work
The Perseverance IP survey has identified a high priority drill target which will be drill tested in the coming
weeks with an RC rig already operating on the Monument Project carrying out resource drilling at the Korong
and Waihi deposits. The Perseverance Prospect has also been heritage cleared, has a PoW in place and is drill-
ready.
Based on the drilling results, further IP surveying across a number of other prospects including Waihi, A4, A39
and A1, all along the 20km long Korong-Waihi BIF corridor may also be considered to allow more accurate drill
targeting of IP conductivity anomalies in future.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
Monument Gold Project
The Monument Gold Project is in WA’s world-class Laverton Gold District and comprises ~195km2 of tenure
located approximately 40km west of Laverton, adjacent and along strike of Genesis Minerals’ (ASX: GMD)
3.3Moz Au Mt Morgan Project. A Mineral Resource Estimate of 154koz of gold (see ASX announcement on 2
August 2021) was undertaken on the Korong and Waihi deposits, which occur along ~20km of relatively
untested banded iron formation, interpreted to be the same unit that hosts the 1.4Moz Westralia gold deposit,
located immediately southeast of Monument.
To date, only ~10% of the potential 20km strike has been drilled with detailed air core and reverse circulation
drilling. There is currently additional priority targets identified along the banded iron formations horizon, that
forms part of a 20km potential structural strike length identified that could also potentially host multiple other
syenite-intrusion style targets (in total approximately 60 targets remaining to be tested).
Figure 5. Monument Gold Project location in the Laverton Gold District amongst major gold deposits.
This announcement has been authorised for release by the Board of Verity Resources Limited.
For further information, please contact:
Verity Resources Limited
info@verityresources.com.au
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
About Verity Resources
Verity Resources owns 100% of the Monument Gold project located near Laverton in Western Australia. This project currently has
a JORC-compliant (2012) Inferred resource of 3.257 Mt @ 1.4 g/t for 154,000 ounces Au. (inferred resources calculated by CSA
Global in 2021 to JORC 2012 compliance using a 0.5 g/t cut-off grade; see 2 August 2021 ASX announcement “Mineral Resources
Estimate declared for Monument Gold Project “for further information).
Verity Resources also holds a supply critical metals portfolio via a joint venture that includes rare earth elements, lithium, gold,
base and precious metals in Brazil, including licences in the “Lithium Valley” and Poços de Caldas in the state of Minas Gerais,
globally known as prolific lithium and rare earth elements districts respectively. The Company also owns 70% of the Pimenta
Project, a potential large-scale REE project in eastern Minas Gerais.
Verity Resources also holds 100% of large critical metals projects in the Limpopo Mobile Belt in Botswana, a district known for
hosting major nickel and copper-producing operations. The Company’s Botswana portfolio contains three flagship projects where
high-grade Cu-Ag (Airstrip and Dibete) and a Maiden JORC Inferred Resource (Maibele North) have been discovered. Maibele
North currently hosts a JORC (2012) inferred resource of 2.4Mt @ 0.72% Ni and 0.21% Cu + PGE’s + Co + Au and is located within
50km of the Selebi mine recently acquired by NASDAQ-listed NexMetals Mining Corp. (NASDAQ:NEXM).
Competent Persons Statement (Monument Gold Project, Western Australia)
The information in this report that relates to Exploration Targets and Exploration Results is based on recent and historical
exploration information compiled by Mr Michael Jackson, who is a Competent Person and a Member of the Australian Institute of
Geoscientists. Mr Jackson is a consultant to Verity Resources Limited. Mr Jackson has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for the reporting of Exploration Results, Mineral Resources and
Ore Reserves”. Mr Jackson consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the above announcement. No
material exploration data or results are included in this document that have not previously been released publicly. The source of
all data or results have been referenced.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s mineral properties, planned exploration program(s) and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may,” "potential," "should," and
similar expressions are forward looking statements. All such statements are subject to certain risks and uncertainties, many of
which are difficult to predict and generally beyond the control of the Company, which could cause actual results to differ materially
from those expressed in, or implied or projected by, the forward-looking information and statements. Our audience is cautioned
not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or
to reflect the occurrence of or non-occurrence of any events.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
Monument Gold Project, Western Australia, Resource Information
Korong Resource
Deposit Tonnes Grade (g/t) Au (Oz)
Korong 3,034,000 1.4 139,000
Waihi 223,000 2.1 15,000
Total 3,257,000 1.4 154,000
Table 1: Inferred Resource was calculated at Korong and Waihi by CSA Global Pty Ltd in 2021 (see Table 2) using a 0.5g/t cut-off grade. See
ASX announcement on 2 August 2021 “Mineral Resource Estimate Declared for Monument Gold Project”.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from the following Company announcements
released to the ASX:
• ASX:VRL 22 December 2020 “Results Received from Recent Reconnaissance Sampling and RC Drill Program Planned Next
Quarter”
• ASX:VRL 2 August 2021 “Mineral Resource Estimate Declared For Monument Gold Project”
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
JORC Code, 2012 Edition – Table 1
Appendix A – JORC CODE, 2012 Edition
Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature & quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity & the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• The company is introducing the results for the
Induced Polarisation (IP) Survey.
• Fender Geophysics were contracted to complete 3
short 2D lines of pole dipole at a 50m electrode
spacing over a geochemically anomalous zone at
Verity Resources Perseverance Prospect approx.
50km west of the Laverton township.
• Array: Pole-Dipole, Static
• Number of Lines: 3
• Line spacing – 200m
• Station Spacing – 50m
• Line Length – 1.2km
• Total Line km – 3.6km
• Receiver array length – 800m
• No of Transmitting points per line - 25
• Total no of Transmitting points - 75
• Data were collected using a GDD GRx 8-32 IP
Receiver (16 Channel) and a GDD TxII Transmitter
(5-10Kva).
• Both C<P and C>P data were collected through the
central 500m of the target BIF horizon.
• Data were quality controlled and bad readings
removed using TQIP program. Data quality was
reasonable / acceptable to roughly N=10.
• The resultant “edited” data were inverted as 2D
lines to produce 2D sections of chargeability and
resistivity.
• 200m line spaced lines were input into a 3D
inversion algorithm to produce modelled
chargeability and resistivity volumes.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) & details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented & if so, by
what method, etc.).If no site visits have
been undertaken indicate why this is the
case.
• Not applicable; No drilling results are reported
Drill sample
recovery
• Method of recording & assessing core &
chip sample recoveries & results assessed.
• Measures taken to maximise sample
recovery & ensure representative nature of
the samples.
• Whether a relationship exists between
• Not applicable; No drilling results are reported
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
sample recovery & grade & whether sample
bias may have occurred due to preferential
loss/gain of fine/coarse material
Logging • Whether core & chip samples have been
geologically & geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining studies
& metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
• The total length & percentage of the
relevant intersections logged
• Not applicable; No drilling results are reported
Sub-sampling
techniques &
sample
preparation
• If core, whether cut or sawn & whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc.& whether sampled wet or
dry.
• For all sample types, the nature, quality &
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• Not applicable; No drilling results are reported
Quality of assay
data &
laboratory tests
• The nature, quality & appropriateness of the
assaying & laboratory procedures used &
whether the technique is considered partial
or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the analysis
including instrument make & model,
reading times, calibrations factors applied &
their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) & whether
acceptable levels of accuracy (i.e. lack of
bias) & precision have been established.
• Data were collected using a GDD GRx 8-32 IP
Receiver (16 Channel) and a GDD TxII Transmitter
(5-10Kva).
• Data were quality controlled and bad readings
removed using TQIP program. Data quality was
reasonable / acceptable to roughly N=10.
Verification of
sampling &
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical & electronic) protocols.
• Discuss any adjustment to assay data.
• Not applicable; no sampling/drilling results
Location of data
points
• Accuracy & quality of surveys used to locate
drill holes (collar & down-hole surveys),
• All data points are recorded in the GDA94, zone 51
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited |ASX: VRL | FSE: 48B0
ACN 122 995 073
trenches, mine workings & other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality & adequacy of topographic control
south coordinate system using a Garmin GPS62
handheld GPS.
Data spacing &
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing & distribution is
sufficient to establish the degree of
geological & grade continuity appropriate
for the Mineral Resource & Ore Reserve
estimation procedure(s)&classifications
applied.
• Whether sample compositing has been
applied.
• Not applicable; No sampling results
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures & the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation & the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed & reported if material
• Orientation of lines has been stated as northeast
040° with station spacing 50m and receiver dipole
50m.
• Orientations of lines were designed perpendicular
to the BIF stratigraphy.
Sample security • The measures taken to ensure sample
security the different materials.
• Not applicable; No sampling results
Audits or reviews • The results of any audits or reviews of
sampling techniques & data.
• No audits or reviews have been undertaken.
Share your feedback