Half Yearly Report and Accounts
Released
Released
Announcement PDF
Verity Resources Limited
ACN 122 995 073
FINANCIAL REPORT
FOR THE HALF-YEAR ENDED
31 DECEMBER 2025
Verity Resources Limited – Interim Financial Report FY2026
2 | P a g e
CONTENTS
Corporate Directory 3
Directors' Report 4
Auditor’s Independence Declaration 14
Consolidated Statement of Profit or Loss and Other Comprehensive Income 15
Consolidated Statement of Financial Position 16
Consolidated Statement of Changes in Equity 17
Consolidated Statement of Cash Flows 18
Condensed Notes to the Consolidated Interim Financial Statements 19
Directors' Declaration 24
Independent Auditor’s Review Report 25
Verity Resources Limited – Interim Financial Report FY2026
3 | P a g e
CORPORATE DIRECTORY
Directors: Patrick A Volpe
Paul Dickson
Elvis Mosweu
Company Secretary: Patrick A Volpe
Registered Office: 832 High Street
Kew East VIC 3102
Share Registry: Automic Group
Level 2/267 St Georges Terrace
Perth WA 6000
Telephone 1300 288 664
Auditor: BDO Audit Pty Ltd
Level 9 Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
ASX Code: VRL
FSE Code: 48B0
Verity Resources Limited – Interim Financial Report FY2026
4 | P a g e
1. DIRECTORS
The names of the Company’s Directors who held office during the period and until the date of this report are set
out below. The Directors were in office for this entire period unless otherwise stated.
Director Position Duration of Appointment
Mr Patrick Volpe Non-Executive Director Appointed 28 February 2024
Mr Paul Dickson Non-Executive Director Appointed 19 March 2025
Mr Elvis Mosweu Non-Executive Director Appointed 21 November 2024
2. PRINCIPAL ACTIVITIES
The Group’s principal activities during the period were exploration at the Monument Gold Project (Western
Australia), the Pimenta and Lithium Valley rare earths and lithium projects (Brazil), and the Dibete Cu-Ag, Airstrip Cu-
Ag and Maibele North Ni-Cu-PGE (Botswana). On 3 December 2025, the Group completed the consolidation of
ownership of the Botswana projects held under joint venture with BCL Limited and obtained 100% ownership
interest in those joint venture projects.
3. REVIEW OF OPERATIONS AND ACTIVITIES
EXPLORATION
MONUMENT GOLD PROJECT, LAVERTON GOLD DISTRICT, WESTERN AUSTRALIA
The Monument Gold Project located in the world-class Laverton Gold District of Western Australia, approximately
40km west of Laverton. The Company holds 100% ownership of the project, which now encompasses approximately
~405km² of prospective tenure following the grant of a significant new exploration licence during the period,
expanding from ~195 km² to ~405 km².
The Monument Project is strategically located directly adjacent to and along strike of Genesis Minerals' (ASX: GMD)
3.3Moz Laverton Gold Project, which includes an operating 3.1Mtpa processing mill.
The project's current JORC (2012) Mineral Resource Estimate (MRE) stands at:
Deposit Tonnes (Mt) Grade (g/t Au) Contained Gold (oz)
Korong 3.034 1.4 139,000
Waihi 0.223 2.1 15,000
TOTAL 3.257 1.4 154,000
Table 1: Monument Gold Project – Current Mineral Resource Estimate (JORC 2012, Inferred)
Note: MRE declared 2 August 2021. An updated MRE is in preparation, incorporating results from the ~11,000m infill
drilling campaign completed during the half year. The Company is targeting an upgrade of a portion to Indicated
classification to support future scoping studies.
DIRECTORS’ REPORT
The Directors of Verity Resources Limited (“Verity” or “the Company”) present their report, together with the
financial statements on the consolidated entity consisting of Verity Resources Limited and its controlled entities for
the half-year ended 31 December 2025 (“the Period”).
It is recommended that the Directors’ report be read in conjunction with the annual financial statements for the
year ended 30 June 2025 and considered together with any public announcement made by the Company during the
period and up to the date of this report.
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
5 | P a g e
Figure 1. Monument Gold Project location in the Laverton Gold District amongst major gold deposits.
Data Validation Study
Prior to commencing the resource upgrade drilling campaign, the Company completed a comprehensive data
validation study covering over 16,000m of historical drilling at the Korong and Waihi deposits. The study
standardised legacy exploration datasets from multiple previous operators including Carpentaria Exploration,
Dominion Mining, and WMC Exploration – dating back to the 1970s, bringing them into compliance with JORC (2012)
standards.
Key outcomes of the data validation study included:
• Standardisation of drill hole collar coordinates, orientation surveys, downhole assay intervals and
lithological logs from multiple historic operators into a single unified database compliant with JORC (2012)
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
6 | P a g e
• Confirmation of multiple high-grade intercepts within the existing resource shell, with multiple intercepts
above 1g/t Au across the full Korong-Waihi resource envelope
• Identification of the priority portions of the 154,000 oz Korong-Waihi resource with the highest confidence
and greatest potential to deliver value in the resource upgrade process.
Phase 1 Resource Upgrade Drilling – Korong Deposit
Verity commenced its Phase 1 resource upgrade drilling program at the Korong deposit in August 2025, with the
program consisting of 3,630m of RC infill and twin drilling across 54 drill holes. Holes were drilled on a 25m x 25m
grid spacing specifically designed to underpin a JORC (2012) upgrade of the Korong resource from Inferred to
Indicated classification.
The Phase 1 program delivered outstanding results, with gold mineralisation confirmed across all holes through the
principal BIF lode system. Results demonstrated consistent gold grades above 1 g/t Au across the mineralised
envelope, with multiple high-grade intercepts confirming the continuity and quality of the deposit.
Hole ID From (m) Width (m) Grade (g/t Au) Including (m) Grade (g/t Au)
KORC25016 78 7.7 6.37 g/t Au 1.0 38.0 g/t Au
KORC25023 96 3.9 6.35 g/t Au 1.0 15.3 g/t Au
KORC25031 76 4.8 2.79 g/t Au 1.0 11.3 g/t Au
KORC25032 97 4.8 2.79 g/t Au - -
KORC25039 48 9.7 1.79 g/t Au - -
KORC25044 64 7.7 2.25 g/t Au - -
KORC25015 62 5.8 2.95 g/t Au - -
KORC25046 54 7.7 1.9 g/t Au 1.0 9.26 g/t Au
KORC25029 37 3.9 3.45 g/t Au - -
KORC25040 71 6.8 1.47 g/t Au - -
KORC25030 57 6.8 1.45 g/t Au - -
Table 2: Monument Gold Project – Phase 1 RC Drilling Highlight Results (Korong Deposit)
Note: Widths reported represent downhole intervals. All results are subject to QAQC protocols. Hole IDs and full
collar coordinates are reported in the Company's ASX announcements dated 25 September 2025 and 23 October
2025.
Phase 2 Resource Upgrade Drilling – Korong and Waihi Deposits
Building on the success of Phase 1, Verity commenced a Phase 2 drilling campaign totalling 6,400m of RC and
diamond holes at both the Korong and Waihi deposits. The Phase 2 program comprised:
• RC infill drilling across 80 holes for ~6,000m within the existing Korong and Waihi resource shells on 25m x
25m spacing
• Diamond drilling of 7 holes for ~1,230m intersecting the target BIF stratigraphy at depth at both Korong
and Waihi, including zones outside the current 154,000 oz resource envelope
• Step-out RC drilling across 18 holes for ~1,476m at the Perseverance, A1, Korong Extension and Waihi
Extension prospects
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
7 | P a g e
Hole ID From (m) Width (m) Grade (g/t Au) Including (m) Grade (g/t Au)
KORC25056 43 3.9 5.76 g/t Au 2.0 9.55 g/t Au
KORC25060 114 6.8 4.84 g/t Au 3.0 9.89 g/t Au
KORC25061 116 3.9 2.82 g/t Au 1.0 7.14 g/t Au
KORC25062 131 3.8 2.72 g/t Au - -
KORC25059 122 3.9 1.89 g/t Au - -
KORC25064 131 4.8 1.45 g/t Au - -
KORC25058 124 1.91 2.63 g/t Au - -
KORC25068 79 6.7 1.9 g/t Au - -
KORC25069 102 6.8 1.36 g/t Au - -
KORC25070 83 5.9 1.28 g/t Au - -
KORC25056 80 2.9 2.25 g/t Au - -
Table 3: Monument Gold Project – Phase 2 Progress Highlight Results (Korong Deposit)
Note: Hole IDs and full collar coordinates are reported in the Company's ASX announcements dated 18 December
2025 and 21 January 2026. The complete dataset will be incorporated into an updated Mineral Resource Estimate.
The diamond drilling component intersected the Korong BIF lode approximately 319m downhole, confirming that
the mineralised system persists well below the current resource envelope and highlighting significant depth
extension potential.
Figure 2. Long section of completed Phase 1 drilling and Phase 2 diamond (green) and RC drilling (blue)
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
8 | P a g e
Perseverance Prospect and IP Survey
During the period, Verity also completed an Induced Polarisation (IP) geophysical survey over 500m of strike at the
Perseverance prospect, located approximately 2km along strike northwest of the Waihi deposit. The survey was
designed to define gold sulphide target zones from surface to 250m depth and will underpin a follow-up drilling
program at this untested prospect.
Perseverance lies at the northwestern end of the 20km Korong-Waihi BIF corridor. Historical rock-chip sampling at
Perseverance previously returned results up to 21.5 g/t Au over 1.4km of strike, while similar sampling from the
adjacent A1-Perseverance corridor returned anomalous results of approximately 1.0 g/t Au from mineralised BIF
outcrops.
BOTSWANA CRITICAL METALS PORTFOLIO
Verity holds a highly prospective portfolio of critical metals projects in Botswana's Limpopo Mobile Belt – a world-
class district hosting major nickel and copper producing operations. During the period, the Company made a
significant strategic acquisition to consolidate to 100% ownership of the portfolio, materially strengthening its
position in this important critical metals jurisdiction.
Strategic Acquisition – 100% Ownership Consolidated
In October 2025, Verity exercised its pre-emptive right under the farm-in joint venture agreement to acquire the
remaining 34% interest held by BCL Investments (a Botswana Government subsidiary under liquidation) in the
Company's Botswana polymetallic JV. The acquisition was completed for a consideration of US$206,060
(approximately A$309,000), at a low cost relative to the portfolio's value and historical exploration investment.
The acquisition was completed through the Company's Botswana subsidiary, African Metals (Pty) Limited, on 3
December 2025. The Company now holds 100% ownership of the entire Botswana portfolio, consolidating its
position and providing greater flexibility to pursue future exploration and corporate activities.
Figure 3. Airstrip, Dibete and Maibele North Projects overlaid on regional VTEM. Numerous additional early-stage
prospects and multiple VTEM anomalies are future exploration targets
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
9 | P a g e
Maibele North – Mineral Resource
The Maibele North project hosts a JORC (2012) Maiden Inferred Mineral Resource of 2.4 million tonnes at 0.72%
Nickel and 0.21% Copper, with additional platinum group element (PGE), cobalt and gold credits. The mineralisation
style is broadly similar to world-class mobile belt deposits including the Nova-Bollinger (ASX: IGO), Julimar (ASX:
CHN) and the globally significant Thompson Belt in Canada.
Mt
Ni
(%)
Cu
(%)
Pt
(g/t)
Pd
(g/t)
Rh
(g/t)
Ru
(g/t)
Au
(g/t)
2.38 0.72 0.21 0.08 0.36 0.04 0.05 0.10
Table 4: Maibele North Inferred Mineral Resource Estimate
Note: JORC (2012) Inferred Resource was calculated at Maibele North by MSA South Africa in 2015 (see Table 1)
using a 0.30% Nickel cut-off grade. See the ASX announcement on 28 April 2015 “Maiden Inferred Resource for
Maibele North” for further information
The project is located within 50km of the Selebi-Phikwe nickel-copper complex recently acquired by NexMetals
Mining Corp (NASDAQ: NEXM). In July 2025, NexMetals received a US$150 million Letter of Interest from the US
Export-Import Bank to support the re-development of the Selebi and Selkirk nickel-copper-cobalt-PGE mines,
underscoring the strategic importance and significant government support for the district.
Airstrip and Dibete – High-Grade Copper-Silver Projects
The Airstrip and Dibete projects are copper-silver projects located along the Limpopo Mobile Belt. Both projects
have returned high-grade copper-silver intersections from previous drilling programs.
Hole ID
From
(m)
Width
(m)
Grade
(% Cu, g/t Ag)
Including
(m)
Grade
(% Cu, g/t Ag)
ACRC003 52 11.0 7.63% Cu, 462 g/t Ag 7.0 11.81% Cu, 717 g/t Ag
ACRC003 52 11.0 7.63% Cu, 462 g/t Ag 3.0 22.74% Cu, 1,379 g/t Ag
ACRD029 55 1.13 21.58% Cu, 1,023 g/t Ag - -
ACRD033 64 0.60 25.27% Cu, 1,283 g/t Ag - 49.06% Cu, 2,493 g/t Ag
Table 5: Airstrip Copper-Silver Highlight Results
Hole ID
From
(m)
Width
(m)
Grade
(% Cu, g/t Ag)
Including
(m)
Grade
(% Cu, g/t Ag)
DBRD117 12 36.0 1.37% Cu, 70 g/t Ag 2.5 7.41% Cu, 456 g/t Ag
DBRC028 33 11.0 4.50% Cu, 229.9 g/t Ag - -
DBRC124 27 25.0 2.17% Cu, 77 g/t Ag - -
Table 6: Dibete Copper-Silver Highlight Results
Note: Hole IDs and full collar coordinates for highlighted Dibete and Airstrip intercepts are reported in the Company's
ASX announcement dated 3 December 2025.
With the portfolio now 100% owned, Verity is actively evaluating near-term work programs across all three projects
to advance the assets toward further resource definition and value realisation. The Company expects to release
updated exploration plans for the Botswana portfolio in the coming months.
BRAZIL CRITICAL METALS PORTFOLIO – PIMENTA REE PROJECT
Verity holds a 70% interest in the Pimenta Project in Minas Gerais, Brazil – a potentially significant rare earth element
(REE) discovery located within the Jacinto Granite Complex in eastern Minas Gerais. The Company also holds a 50%
joint venture interest in a portfolio of nine additional Brazilian projects covering REE, gold, lithium, and other base
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
10 | P a g e
and precious metals, including projects at the Caldera region and Poços de Caldas Alkaline complex in southern
Minas Gerais, and licences in the 'Lithium Valley' in northern Minas Gerais.
Pimenta Project – Discovery Overview
The Pimenta Project represents a potentially large-scale, allanite-hosted REE discovery with a geological and
mineralisation style analogous to American Rare Earths' (ASX: ARR) Halleck Creek Project, one of the largest allanite-
hosted REE deposits in the United States (2.63 billion tonnes @ 3,292 ppm TREO). The project benefits from excellent
infrastructure, including proximity to sealed roads, hydroelectric power, and an experienced local workforce.
A reconnaissance surface sampling program completed in early calendar year 2025 collected 137 samples across a
>20km airborne thorium radiometric anomaly zone. The program confirmed widespread, high-grade REE
enrichment at surface consistent with a residual weathering enrichment model (REE geochemistry remains
consistent between fresh granite and overlying regolith).
The REE mineralisation is enriched in high-value magnet rare earth elements (MREOs), which comprise
approximately 25% of the total REE content. The MREO suite – neodymium (Nd), praseodymium (Pr), dysprosium
(Dy) and terbium (Tb) – is critical for permanent magnet manufacturing for electric vehicles and renewable energy
turbines, commanding the highest price premiums in the REE market.
Auger Drilling Program
Following the exceptional surface sampling results, Verity commenced a maiden auger drilling program at the
Pimenta Project in June 2025. The program comprises approximately 20 auger holes targeting two priority zones
within the >20km airborne thorium anomaly where surface sampling identified the strongest geochemical
correlation and highest concentrations of TREO, Ga₂O₃ and TiO₂.
The program was designed to:
• Test the vertical and lateral continuity of REE, gallium and titanium mineralisation within the saprolite zone
• Confirm the depth extent of the allanite-hosted REE enrichment profile
• Provide a dataset to support future resource delineation studies
Hole ID
From
(m) Width (m)
Grade
(TREO)
MREO/TREO
(%) Including (m)
Grade
(TREO)
PMT-AUG-011 0 4.0 2,053 ppm 25% 1.0 4,171 ppm
PMT-AUG-014 0 5.0 2,250 ppm 26% - -
PMT-AUG-016 0 4.0 2,204 ppm 26% - -
PMT-AUG-020 0 4.0 2,683 ppm 26% - -
PMT-AUG-039 0 4.0 2,322 ppm 24% - -
PMT-AUG-043 0 5.0 2,329 ppm 25% - -
PMT-AUG-044 0 7.0 2,193 ppm 28% - -
Table 7: Pimenta Project – Auger Drilling Highlight Results
Note: Hole IDs and full collar coordinates for highlighted Pimenta intercepts are reported in the Company's ASX
announcement dated 16 October 2025.
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
11 | P a g e
Figure 4. Pimenta Project with significant TREO intercepts, over airborne radiometric image.
Other Brazilian Projects
In addition to Pimenta, Verity holds a 50% JV interest in a portfolio of nine Brazilian exploration licences through its
JV partner. Key assets include:
• Caldera and Caldera South Projects: Located within the Poços de Caldas Alkaline Complex in southern
Minas Gerais, adjacent to Meteoric Resources (ASX: MEI) and Viridis Mining and Metals (ASX: VMM) REE
projects. These projects are in a prolific ionic clay and carbonatite-hosted REE district.
• Lithium Valley Licences: Exploration licences in northern Minas Gerais' 'Lithium Valley', one of the world's
most prominent lithium-producing districts.
• Additional Gold, PGE and Base Metal Projects: Covering prospective ground across Ceará State.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements, and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed.
CORPORATE
Frankfurt Stock Exchange Listing
On 17 July 2025, Verity Resources achieved a dual listing on the Frankfurt Stock Exchange (FSE: 48B0). The dual listing
provides the Company with access to European institutional and retail capital markets, enhances shareholder
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
12 | P a g e
liquidity, and positions Verity to benefit from growing European demand for critical minerals exposure following the
EU's Critical Raw Materials Act (CRMA).
Share Placement
On 4 September 2025, the Company announced it had received firm commitments to raise A$3.0 million (before
costs) via a two-tranche placement of ordinary shares (Placement). Tranche 1 ($1.7 million before costs) was
completed in September 2025 and Tranche 2 ($1.3 million before costs) was completed in November 2025 following
shareholder approval at a general meeting held on 7 November 2025. Approximately 125 million new shares were
issued at $0.024 per share under the Placement, with one free attaching option for every three shares subscribed
(options exercisable at $0.048, expiring two years from issue). The placement was well-supported by both new and
existing shareholders, including participation by the Company’s directors that subscribed for a total of $250,000
under Tranche 2.
Annual General Meeting
The Company held its Annual General Meeting of Shareholders on 26 November 2025. All resolutions were passed
on a poll.
4. SIGNIFICANT CHANGES TO THE STATE OF AFFAIRS
Other than as outlined above, there have been no significant changes to the state of affairs during the half-year ended
31 December 2025.
5. FINANCIAL RESULTS
The financial results of the Company for the half year ended 31 December 2025 are:
31-Dec-25 30-Jun-25
Cash and cash equivalents ($) 860,292 891,616
Net assets ($) 1,209,322 1,790,486
31-Dec-25 31-Dec-24
Net loss after tax ($) (3,475,217) (792,548)
Loss per share (cents) (1.03) (1.30)1
1
on a post 20-for-1 consolidation basis.
6. EVENTS OCCURRING AFTER REPORTING DATE
On 11 March 2026, the Company completed a non-renounceable entitlement offer (Offer) of one (1) fully paid
ordinary share for every five (5) shares held by eligible shareholders on the Record Date at an issue price of $0.025
each, together with one (1) free attaching unlisted option for every (1) New Share subscribed for and issued
(exercisable at $0.036 and expiring 5 years from the date of issue), raising approximately $2.0 million (before costs).
The Offer was partially underwritten by two of the Company’s directors (via their associated entities) and closed fully
subscribed raising the full amount.
Funds raised under the Offer will be applied towards advancing the Monument Gold Project through the next phase
in development including scoping level mine planning and optimisation work, re-commencing exploration programs
at the high grade copper-silver projects in Botswana, follow up test work at the Pimenta REE project in Brazil, costs
of the Offer, working capital requirements and assessment of potential additional opportunities.
Other than as stated above, no other matters or circumstances have arisen since the end of the half-year which
significantly affected or may significantly affect the operations of the consolidated entity, the results of those
operations, or the state of affairs of the consolidated entity in subsequent financial periods.
7. AUDITOR’S INDEPENDENCE DECLARATION
The auditor’s independence declaration under s 307C of the Corporations Act 2001 is set out on page 12 for the
half-year ended 31 December 2025.
This report is signed in accordance with a resolution of the Board of Directors.
DIRECTORS’ REPORT
Verity Resources Limited – Interim Financial Report FY2026
13 | P a g e
Mr Patrick Volpe
Director and Company Secretary
13 March 2026
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms.
Liability limited by a scheme approved under Professional Standards Legislation.
DECLARATION OF INDEPENDENCE BY PHILLIP MURDOCH TO THE DIRECTORS OF VERITY RESOURCES
LIMITED
As lead auditor for the review of Verity Resources Limited for the half-year ended 31 December 2025,
I declare that, to the best of my knowledge and belief, there have been:
1. No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2. No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Verity Resources Limited and the entities it controlled during the
period.
Phillip Murdoch
Director
BDO Audit Pty Ltd
Perth
13 March 2026
VERITY RESOURCES LIMITED
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Verity Resources Limited – Interim Financial Report FY2026
15 | P a g e
Note 31-Dec-25 31-Dec-24
$ $
Other Income 9,133 5,877
Administrative and corporate expenses (177,725) (162,212)
Other expenses - (47,343)
Directors’ remuneration and fees (31,486) (82,533)
Professional fees (238,674) (56,223)
Marketing (85,361) (4,716)
Depreciation (8,211) (153)
Share based payments 5(a) (128,555) -
Exploration expenses (2,814,338) (445,245)
Loss before income tax for the period (3,475,217) (792,548)
Income tax expense - -
Loss after income tax for the period (3,475,217) (792,548)
Other comprehensive loss that may be subsequently
reclassified to profit or loss
Exchange differences from translation of foreign operations (53,543) 676
Total comprehensive loss for the period attributable to
members of Verity Resources Limited (3,528,760) (791,872)
Loss per share for the period attributable to the members of
Verity Resources Limited:
Basic and diluted loss per share (post-consolidation, cents) 3 (1.03) (1.30)
The Consolidated Statement of Profit or Loss and Other Comprehensive Income should be
read in conjunction with the notes to the financial statements.
VERITY RESOURCES LIMITED
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2025
Verity Resources Limited – Interim Financial Report FY2026
16 | P a g e
Note 31-Dec-25 30-Jun-25
$ $
ASSETS
Current Assets
Cash and cash equivalents 860,292 891,616
Trade and other receivables 188,385 45,013
Total Current Assets 1,048,677 936,629
Non-Current Assets
Property, plant and equipment 64,399 73,616
Exploration and evaluation expenditure 1,198,714 1,198,714
Total Non-Current Assets 1,263,113 1,272,330
TOTAL ASSETS 2,311,790 2,208,959
LIABILITIES
Current Liabilities
Trade and other payables 1,102,468 418,473
Total Current Liabilities 1,102,468 418,473
TOTAL LIABILITIES 1,102,468 418,473
NET ASSETS 1,209,322 1,790,486
EQUITY
Issued capital 4 38,467,609 35,648,568
Reserves 5 809,851 734,839
Accumulated losses (38,068,138) (34,592,921)
TOTAL EQUITY 1,209,322 1,790,486
The Consolidated Statement of Financial Position should be
read in conjunction with the notes to the financial statements.
VERITY RESOURCES LIMITED
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
Verity Resources Limited – Interim Financial Report FY2026
17 | P a g e
Issued
Share
Capital
Share-based
Payments
Reserve
Foreign
Currency
Translation
Reserve
Accumulated
Losses
Total
Equity
$ $ $ $ $
Balance at 1 Jul 2025 35,648,568 1,039,392 (304,553) (34,592,921) 1,790,486
Net loss for the half-year - - - (3,475,217) (3,475,217)
Other comprehensive income
for the half-year
- - (53,543) - (53,543)
Total comprehensive income
for the period
- - (53,543) (3,475,217) (3,528,760)
Transactions with owners in
their capacity as owners:
Shares issued during the
period
3,017,152 - - - 3,017,152
Share issue costs (198,110) - - - (198,110)
Share-based payment
transactions
- 128,555 - - 128,555
Balance at 31 Dec 2025 38,467,610 1,167,947 (358,096) (38,068,138) 1,209,322
Balance at 1 Jul 2024 33,752,761 1,273,964 (292,076) (33,272,790) 1,461,859
Net loss for the half-year - - - (792,548) (792,548)
Other comprehensive income
for the half-year
- - 676 - 676
Total comprehensive income
for the period -
- 676 (792,548) (791,872)
Transactions with owners in
their capacity as owners:
Shares issued during the
period
596,545 - - - 596,545
Share issue costs (32,275) - - - (32,275)
Share-based payment
transactions
- - - - -
Balance at 31 Dec 2024 34,317,030 1,273,964 (291,400) (34,065,338) 1,234,256
The Consolidated Statement of Changes in Equity should be
read in conjunction with the notes to the financial statements.
VERITY RESOURCES LIMITED
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
Verity Resources Limited – Interim Financial Report FY2026
18 | P a g e
31-Dec-25 31-Dec-24
$ $
Cash flows used in operating activities
Interest received 8,822 5,871
Payments to suppliers and employees (624,357) (242,958)
Payments for exploration and evaluation (2,234,830) (445,245)
Net cash flows used in operating activities (2,850,365) (682,332)
Cash flows from investing activities
Payment for purchase of plant and equipment - (2,244)
Net cash flows used in investing activities - (2,244)
Cash flows from financing activities
Issue of share capital 2,998,129 596,545
Payments of share capital issue costs (179,088) (32,276)
Proceeds from short term loans - 200,000
Net cash flows used in financing activities 2,819,041 764,269
Net increase in cash and cash equivalents (31,324) 79,693
Cash and cash equivalents at the beginning of the period 891,616 271,116
Foreign currency effect on cash held - 676
Cash and cash equivalents at the end of the period 860,292 351,485
The Consolidated Statement of Cash Flows should be
read in conjunction with the notes to the financial statements.
VERITY RESOURCES LIMITED
Notes to the Consolidated Interim Financial Statements
Verity Resources Limited – Interim Financial Report FY2026
19 | P a g e
NOTE 1: MATERIAL ACCOUNTING POLICIES
These general purpose interim financial statements for half-year reporting period ended 31 December 2025 have
been prepared in accordance with requirements of the Corporations Act 2001 and Australian Accounting
Standard AASB 134: Interim Financial Reporting. The Group is a for-profit entity for financial reporting purposes
under Australian Accounting Standards.
This interim financial report is intended to provide users with an update on the latest annual financial statements
of Verity Resources Limited. It is therefore recommended that this financial report be read in conjunction with
the annual financial statements of the Group for the year ended 30 June 2025, together with any public
announcements made during the following half-year.
Accounting Policies
The interim financial statements have been prepared in accordance with the accounting policies applied in the
previous financial year and those of the corresponding interim reporting period, other than as detailed below.
New and amended Accounting Standards that are effective for the current period
The Company has adopted all of the new and revised Standards and Interpretations issued by the Australian
Accounting Standards Board (the AASB) that are relevant to their operations and effective for the current half-
year.
Their adoption has not had any material impact on the disclosures or on the amounts reported in these financial
statements.
Going Concern
The financial report has been prepared on a going concern basis, which contemplates the continuity of normal
business activity and the realisation of assets and the settlement of liabilities in the normal course of business.
The Company incurred a net loss of $3,475,217 for the half-year ended 31 Dece
Share your feedback
Discover