Monument Gold Resource Upgrade Drilling Commenced
Released
Released
Announcement PDF
ASX Announcement
Resource Upgrade Drilling Commenced
HIGHLIGHTS
RESOURCE UPGRADE DRILLING
•
First stage 3,600m RC drill program commenced as part of the Monument Gold Project’s 154koz
Au resource upgrade strategy
•
Program comprising infill drilling and twinning of historical drill holes to upgrade the Korong
(139Koz Au) Inferred resource to Indicated confidence level (JORC 2012), to be followed by Waihi
(15koz Au).
•
Historical high grade intercepts at Korong include:
•
6m @ 3.15g/t Au (KORC001 – from 95m)
•
5m @ 3.22g/t Au (KORC002 – from 130m)
•
5m @ 2.56g/t Au (KORC016 – from 124m)
•
5m @ 2.03g/t Au (KORC021 – from 60m)
•
Campaign forms part of a multi-stage drilling initiative, including resource expansion drilling and
early-stage metallurgical testing to inform mining licence application
•
Mineralisation across the 154koz resource - Korong (139koz) and Waihi (15koz) - remains open in
all directions and at depth with significant scope for additional resource ounces with further
expansion drilling
MONUMENT GOLD PROJECT
•
Monument Gold Project is located in WA’s world-class Laverton Gold District and comprises
~195km2 of tenure, directly adjacent to and along strike of Genesis Minerals’ (ASX: GMD) 3.3Moz
Laverton Gold Project with 3.1Mtpa operating mill
•
Monument also hosts ~20km of relatively untested banded iron formation, interpreted to be the
same unit that hosts the 1.4Moz Westralia gold deposit, located directly southeast of Monument
•
Over 60 additional BIF, basalt and intrusion-hosted gold drill targets at the Monument Gold
Project remain to be adequately tested
Verity Resources Limited (ASX: VRL, FSE: 48B0) (Verity or the Company) is pleased to announce that drilling
has commenced on time for the first phase of its resource upgrade and expansion drilling campaign at the
100%-owned 3.3Mt @ 1.4g/t Au (154koz Au) Monument Gold Project in the prolific Laverton Goldfields,
Western Australia.
The initial phase of RC drilling will comprise 54 drill holes for a total of approximately 3,600 metres. This phase
aims to increase geological confidence and facilitate the upgrade of existing Korong resource from JORC (2012)
Inferred to Indicated confidence level, as a precursor to future scoping studies.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Drilling will focus primarily on infill drilling and twinning of historical drill holes with previous high grade
intercepts including:
•
6m @ 3.15g/t Au
(KORC001 – from 95m)
•
5m @ 3.22g/t Au
(KORC002 – from 130m)
•
7m @ 1.21g/t Au
(KORC004 – from 110m)
•
6m @ 1.69g/t Au
(KORC012 – from 78m)
•
5m @ 2.56g/t Au
(KORC016 – from 124m)
•
5m @ 2.03g/t Au
(KORC021 – from 60m)
Above. Drill rig mobilized and drilling commenced at Korong 139koz Au deposit
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Figure 1: Longsection of Korong 139koz Resource with proposed phase one infill drill hole locations
Further details of the resource upgrade and expansion drill program were included in the Company’s ASX
announcement “Resource Upgrade and Expansion Drill Campaign to Commence” released 15 July 2025.
The Company expects drilling to be completed within three weeks, weather permitting. The Company will
update the market as the drill program progresses.
About the Monument Gold Project
The Monument Gold Project is in WA’s world-class Laverton Gold District and comprises ~195km2 of tenure
located approximately 40km west of Laverton, adjacent and along strike of Genesis Minerals’ (ASX: GMD)
3.3Moz Au Mt Morgan Project. A Mineral Resource Estimate of 154koz of gold (see ASX announcement on 2
August 2021) was undertaken on the Korong and Waihi deposits, which occur along ~20km of relatively
untested banded iron formation, interpreted to be the same unit that hosts the 1.4Moz Westralia gold deposit,
located immediately southeast of Monument.
To date, only ~10% of the potential 20km strike has been drilled with detailed air core and reverse circulation
drilling. There is currently additional priority targets identified along the banded iron formations horizon, that
forms part of a 20km potential structural strike length identified that could also potentially host multiple
other syenite-intrusion style targets (in total approximately 60 targets remaining to be tested).
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Figure 2. Monument Gold Project location in the Laverton Gold District amongst major gold deposits.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Figure 3. Monument Gold Project location adjacent to Genesis Minerals’ 3.3Moz Mt Morgan Project
This announcement has been authorised for release by the Board of Verity Resources Limited.
For further information, please contact:
Verity Resources Limited
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
About Verity Resources
Verity Resources owns 100% of the Monument Gold project located near Laverton in Western Australia. This project currently has
a JORC-compliant (2012) Inferred resource of 3.257 Mt @ 1.4 g/t for 154,000 ounces Au. (inferred resources calculated by CSA
Global in 2021 to JORC 2012 compliance using a 0.5 g/t cut-off grade; see 2 August 2021 ASX announcement “Mineral Resources
Estimate declared for Monument Gold Project “for further information).
Verity Resources also holds a supply critical metals portfolio via a joint venture that includes rare earth elements, lithium, gold,
base and precious metals in Brazil, including licences in the “Lithium Valley” and Poços de Caldas in the state of Minas Gerais,
globally known as prolific lithium and rare earth elements districts respectively. The Company also owns 70% of the Pimenta
Project, a potential large-scale REE project in eastern Minas Gerais.
Verity Resources also holds large base and precious metals projects in the Limpopo Mobile Belt in Botswana, a district known for
hosting major nickel and copper-producing operations. The Company’s Botswana portfolio contains three flagship projects where
high-grade Cu-Ag (Airstrip and Dibete) and a Maiden JORC Inferred Resource (Maibele North) have been discovered. Maibele
North currently hosts a JORC (2012) inferred resource of 2.4Mt @ 0.72% Ni and 0.21% Cu + PGE’s + Co + Au and is located within
50km of the Selebi-Phikwe mine recently acquired by NASDAQ-listed NexMetals Mining Corp. (NASDAQ:NEXML).
Competent Persons Statement (Monument Gold Project, Western Australia)
The information in this report that relates to Exploration Targets and Exploration Results is based on recent and historical
exploration information compiled by Mr Michael Jackson, who is a Competent Person and a Member of the Australian Institute
of Geoscientists. Mr Jackson is a consultant to Verity Resources Limited. Mr Jackson has sufficient experience that is relevant to
the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for the reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Jackson consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
Drill Hole Locations
Drill hole locations presented in this ASX announcement are indicative at this stage and subject to change.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the above announcement. No
material exploration data or results are included in this document that have not previously been released publicly. The source of
all data or results have been referenced.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s mineral properties, planned exploration program(s) and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may,” "potential," "should," and
similar expressions are forward looking statements. All such statements are subject to certain risks and uncertainties, many of
which are difficult to predict and generally beyond the control of the Company, which could cause actual results to differ materially
from those expressed in, or implied or projected by, the forward-looking information and statements. Our audience is cautioned
not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or
to reflect the occurrence of or non-occurrence of any events.
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Monument Gold Project, Western Australia, Resource Information
Korong Resource
Deposit
Tonnes
Grade (g/t)
Korong
3,034,000
1.4
Waihi
223,000
2.1
Total
3,257,000
1.4
Au (Oz)
139,000
15,000
154,000
Table 1: JORC-compliant (2012) Inferred Resource was calculated at Korong and Waihi by CSA Global Pty Ltd in 2021 (see Table 2) using a
0.5g/t cut-off grade. See ASX announcement on 2 August 2021 “Mineral Resource Estimate Declared for Monument Gold Project”.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from the following Company announcements
released to the ASX:
• ASX:VRL 2 August 2021 “Mineral Resource Estimate Declared For Monument Gold Project”
• ASX:VRL 19 December 2022 “Broad, High-Grade Gold Intersected at Monument Gold Project”
• ASX:VRL 15 July 2025 “Resource Upgrade and Expansion Drill Campaign to Commence - Amended”
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Share your feedback
Discover