Up to 38g/t Au from Successful Phase 1 Drilling
Released
Released
Announcement PDF
ASX Announcement
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Further Exceptional Gold Intersections from Phase 1
Resource Upgrade Drilling at Monument Gold Project
Verity Resources Limited (ASX: VRL, FSE: 48B0) (Verity or the Company) is pleased to report the second batch
infill drilling results from the Phase 1 resource upgrade and expansion program at the 100%-owned 3.3Mt @
1.4g/t Au (154koz) Monument Gold Project in the prolific Laverton Goldfields, Western Australia.
HIGHLIGHTS
PHASE 1 INFILL DRILL RESULTS CONFIRM INCREASING CONFIDENCE IN 154KOZ RESOURCE
• Significant high grade gold intercepts at the Korong (139koz) deposit include (all true widths):
o 7.7m @ 6.37g/t from 78m including 1m @ 38.0g/t (KORC25016)
o 3.9m @ 6.35g/t from 96m including 1m @ 15.3g/t (KORC25023)
o 4.8m @ 3.91g/t from 97m (KORC25032)
o 4.8m @ 2.79g/t from 76m including 1m @ 11.3g/t (KORC25031)
o 9.7m @ 1.79g/t from 48m (KORC25039)
o 7.7m @ 2.25g/t from 64m (KORC25044)
o 5.8m @ 2.95g/t from 62m (KORC25015)
o 7.7m @ 1.9g/t from 54m including 1m @ 9.26g/t (KORC25046)
o 3.9m @ 3.45g/t from 37m (KORC25029)
o 6.8m @ 1.47g/t from 71m (KORC25040)
o 6.8m @ 1.45g/t from 57m (KORC25030)
• Consistent gold mineralisation with +1g/t intercepts returned from 54 completed Phase 1 RC holes
over 3,630 metres drilled at the Monument Gold Project (Laverton Goldfields, WA), targeting
conversion of a portion of the 154koz Au Inferred Resource at Korong and Waihi to higher
confidence categories.
• Results continue to confirm the geological model and grade continuity of the BIF main lode at
Korong
• Phase 2 RC + diamond drilling in progress aiming to extend high-grade shoots and test
depth/strike for potential resource expansion
• Only ~10% of the ~20km BIF trend systematically drilled to date at the Monument Gold Project -
multiple untested structural and syenite-associated targets remain to be adequately tested
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Verity Director, Patrick Volpe, commented,
“We are very pleased to report further exceptional results from the Phase 1 infill drill program that
is now complete and has exceeded expectations. Drilling has confirmed the mineralisation model at
the 139koz Korong deposit and once again validates our resource upgrade and expansion strategy.
The second batch of results continues to demonstrate consistent +1g/t intercepts across intercepts
reported, with further exceptional, thick intercepts such as 7.7m @ 6.37g/t including 1m @
38.0g/t, 3.9m @ 6.35g/t including 1m @ 15.3g/t, and 4.8m @ 2.79g/t including 1m @ 11.3g/t.
With Phase 1 successfully completed, we turn our attention to the Phase 2 RC and diamond drilling
program in progress at both Korong (139koz) and Waihi (15koz), which aims to test the potential
for resource expansion at depth.
We look forward to reporting results from the Phase 2 program as we aim to replicate the success
from Phase 1.”
Final Phase 1 Infill Drill Results
The current release of infill results comprises 17 holes for 1,532m that were infill and twin drilled at the 139koz
Korong deposit, aiming to convert a targeted portion of the inferred resource to indicated (Figure 1).
The first phase of the infill drilling program is now complete (54 holes, 3,630 metres), with Phase 2 diamond
and reverse circulation drilling in progress (77 holes, 6,400 metres). The Phase 1 results show excellent
reconciliation against historical drilling, verifying historical unvalidated drill holes. The program consistently
returned thick, +1g/t gold intercepts across the main BIF lode (refer Appendix B for full results), including:
o 7.7m @ 6.37g/t from 78m including 1m @ 38.0g/t (KORC25016)
o 3.9m @ 6.35g/t from 96m including 1m @ 15.3g/t (KORC25023)
o 4.8m @ 3.91g/t from 97m (KORC25032)
o 4.8m @ 2.79g/t from 76m including 1m @ 11.3g/t (KORC25031)
o 9.7m @ 1.79g/t from 48m (KORC25039)
o 7.7m @ 2.25g/t from 64m (KORC25044)
o 5.8m @ 2.95g/t from 62m (KORC25015)
o 7.7m @ 1.9g/t from 54m including 1m @ 9.26g/t (KORC25046)
o 3.9m @ 3.45g/t from 37m (KORC25029)
o 6.8m @ 1.47g/t from 71m (KORC25040)
o 6.8m @ 1.45g/t from 57m (KORC25030)
The progress results are demonstrating grade continuity at 25m x 25m spacing to support Verity’s plan to
upgrade select parts of the resource to Indicated status in the next mineral resource estimate (MRE). The lodes
remain open along strike and down-plunge, preserving clear growth options for the Phase 2 RC and
diamond drilling currently in progress.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 1. Long Section view of recently completed drilling with assays, looking from the hanging wall down onto the mineralised
Banded Iron Formation (BIF) horizon (red outline). Outline of the current 154koz Au Inferred Resource is shown (black).
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 2. Representative cross section A-A’ through the core of the Korong mineralisation showing the BIF main mineralised lode.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 3. Representative cross section B-B’ through the core of the Korong mineralisation showing the BIF main mineralised
lode.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 4. Representative cross section C-C’ through the core of the Korong mineralisation showing the BIF main mineralised lode.
Phase 2 Drill Program
Phase 2 RC and diamond drilling is currently in progress at the 139koz Au Korong deposit and 15koz Au
Waihi deposit, with drilling focused on both step out extensions and infill drilling the most prospective
zones of the Inferred Resource (refer ASX releases 16 September 2025 and 6 October 2025).
Additionally, down plunge diamond drill holes were designed to validate the high grade plunge of the
Inferred Resource at both Korong and Waihi. The program will comprise 77 drill holes (5 DD and 72 RC) for
a total of approximately 6,400 metres. This phase completes the infill drilling required to increase geological
confidence and facilitate the upgrade of existing 154koz resource from Inferred to Indicated confidence
level, as a precursor to the next phase of scoping studies.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Resource Upgrade and Expansion Campaign
The 10,000 metre Phase 1 and Phase 2 resource upgrade and expansion drill program aims to increase
geological confidence and facilitate the upgrade of the existing Korong and Waihi resources from JORC (2012)
Inferred to Indicated confidence level, as a precursor to future scoping studies.
Drilling focused primarily on infill drilling, twinning of historical drill holes, and include a step-out holes
designed to test the potential to expand the mineralisation footprint.
Monument Gold Project
The Monument Gold Project is in WA’s world-class Laverton Gold District and comprises ~195km2 of tenure
located approximately 40km west of Laverton, adjacent and along strike of Genesis Minerals’ (ASX: GMD)
3.3Moz Au Mt Morgan Project. A Mineral Resource Estimate of 154koz of gold (see ASX announcement on 2
August 2021) was undertaken on the Korong and Waihi deposits, which occur along ~20km of relatively
untested banded iron formation, interpreted to be the same unit that hosts the 1.4Moz Westralia gold deposit,
located immediately southeast of Monument.
To date, only ~10% of the potential 20km strike has been drilled with detailed air core and reverse circulation
drilling. There is currently additional priority targets identified along the banded iron formations horizon, that
forms part of a 20km potential structural strike length identified that could also potentially host multiple other
syenite-intrusion style targets (in total approximately 60 targets remaining to be tested).
Figure 5. Monument Gold Project location in the Laverton Gold District amongst major gold deposits.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 6. Monument Gold Project location adjacent to Genesis Minerals’ 3.3Moz Mt Morgan Project
This announcement has been authorised for release by the Board of Verity Resources Limited.
For further information, please contact:
Verity Resources Limited
info@verityresources.com.au
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
About Verity Resources
Verity Resources owns 100% of the Monument Gold project located near Laverton in Western Australia. This project currently
has a JORC-compliant (2012) Inferred resource of 3.257 Mt @ 1.4 g/t for 154,000 ounces Au. (inferred resources calculated by
CSA Global in 2021 to JORC 2012 compliance using a 0.5 g/t cut-off grade; see 2 August 2021 ASX announcement “Mineral
Resources Estimate declared for Monument Gold Project “for further information).
Verity Resources also holds a supply critical metals portfolio via a joint venture that includes rare earth elements, lithium, gold,
base and precious metals in Brazil, including licences in the “Lithium Valley” and Poços de Caldas in the state of Minas Gerais,
globally known as prolific lithium and rare earth elements districts respectively. The Company also owns 70% of the Pimenta
Project, a potential large-scale REE project in eastern Minas Gerais.
Verity Resources also holds 100% of large critical metals projects in the Limpopo Mobile Belt in Botswana, a district known for
hosting major nickel and copper-producing operations. The Company’s Botswana portfolio contains three flagship projects
where high-grade Cu-Ag (Airstrip and Dibete) and a Maiden JORC Inferred Resource (Maibele North) have been discovered.
Maibele North currently hosts a JORC (2012) inferred resource of 2.4Mt @ 0.72% Ni and 0.21% Cu + PGE’s + Co + Au and is
located within 50km of the Selebi-Phikwe mine recently acquired by NASDAQ-listed NexMetals Mining Corp. (NASDAQ:NEXML).
Competent Persons Statement (Monument Gold Project, Western Australia)
The information in this report that relates to Exploration Targets and Exploration Results is based on recent and historical
exploration information compiled by Mr Michael Jackson, who is a Competent Person and a Member of the Australian Institute of
Geoscientists. Mr Jackson is a consultant to Verity Resources Limited. Mr Jackson has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for the reporting of Exploration Results, Mineral Resources and
Ore Reserves”. Mr Jackson consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the above announcement. No
material exploration data or results are included in this document that have not previously been released publicly. The source of
all data or results have been referenced.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s mineral properties, planned exploration program(s) and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may,” "potential," "should," and
similar expressions are forward looking statements. All such statements are subject to certain risks and uncertainties, many of
which are difficult to predict and generally beyond the control of the Company, which could cause actual results to differ materially
from those expressed in, or implied or projected by, the forward-looking information and statements. Our audience is cautioned
not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or
to reflect the occurrence of or non-occurrence of any events.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Monument Gold Project, Western Australia, Resource Information
Korong Resource
Deposit Tonnes Grade (g/t) Au (Oz)
Korong 3,034,000 1.4 139,000
Waihi 223,000 2.1 15,000
Total 3,257,000 1.4 154,000
Table 1: Inferred Resource was calculated at Korong and Waihi by CSA Global Pty Ltd in 2021 (see Table 2) using a 0.5g/t cut-off grade. See
ASX announcement on 2 August 2021 “Mineral Resource Estimate Declared for Monument Gold Project”.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from the following Company announcements
released to the ASX:
• ASX:VRL 25 September 2025 “Excellent Gold Results at Monument Gold Project”
• ASX:VRL 12 September 2025 “Historical Drill Validation Study Confirms High Grade Zones at Monument Gold Project”
• ASX:VRL 2 August 2021 “Mineral Resource Estimate Declared For Monument Gold Project”
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
JORC Code, 2012 Edition – Table 1
Appendix A – JORC CODE, 2012 Edition
Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature & quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity & the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
Reverse circulation (RC) percussion chip samples were
collected at 1m intervals from a rig mounted
cyclone and cone splitter, split into 2 to 2.5kg sub-
samples and collected into pre-numbered calico
bags.
The calico bag sub-samples were then submitted to an
independent laboratory where the entire sample
was pulverised to a nominal sample weight for Fire
Assay analysis (see Quality of assay data and
laboratory tests below).
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) & details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented & if so, by
what method, etc.).If no site visits have
been undertaken indicate why this is the
case.
Reverse Circulation (RC)
All RC drilling was undertaken using 5¼ to 5¾ inch face
sampling bits.
Drill sample
recovery
• Method of recording & assessing core &
chip sample recoveries & results assessed.
• Measures taken to maximise sample
recovery & ensure representative nature of
the samples.
• Whether a relationship exists between
sample recovery & grade & whether sample
bias may have occurred due to preferential
loss/gain of fine/coarse material
Continuous visual monitoring and assessment of
sample recoveries was undertaken by suitably
qualified field staff (contract geologist and senior
field assistant).
Where low recoveries or wet samples were identified
these were recorded in the field sample data.
To aid in achieving high recoveries and maintaining a
dry sample a support truck mounted air booster
was used when necessary.
There is no evidence of sample bias.
Logging • Whether core & chip samples have been
geologically & geotechnically logged to a
level of detail to support appropriate
RC chip logging was undertaken by a suitably qualified
contract geologist who also monitored quality of
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Mineral Resource estimation, mining studies
& metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
• The total length & percentage of the
relevant intersections logged
sampling.
Logging of RC chips was undertaken by wet sieving a
representative portion of the overall 1m sample
recovered from the cyclone and collecting a sub-
sample into a labelled, 20 compartment chip tray.
The logging is considered qualitative with weathering,
lithology, alteration, quartz veining and presence of
sulphides recorded in the logging template. All
chips trays were labelled with hole ID and sample
depth and photographed for future reference.
Logging and sampling of percussion chips at 1m
intervals is considered the preferred RC sample
interval to use in Mineral Resource Estimation.
Sub-sampling
techniques &
sample
preparation
• If core, whether cut or sawn & whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc.& whether sampled wet or
dry.
• For all sample types, the nature, quality &
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
All RC percussion sample material was passed through
a rig-mounted cyclone with a cone splitter attached
to the base and collected at 1m intervals into pre-
numbered calico bags.
At the completion of each 6m drill rod the cyclone and
cone splitter were cleaned to avoid contamination.
Duplicate Quality Control (QC) samples were taken
every 60 samples as an identical split in conjunction
with the corresponding original sample.
Certified reference materials obtained from an
external, independent supplier were inserted every
60 samples.
Sample preparation was undertaken at an
independent laboratory. Samples were dried and
pulverised to 85% passing 75µm.
Sample sizes are considered appropriate for the size
and nature of the material being sampled.
Quality of assay
data &
laboratory tests
• The nature, quality & appropriateness of the
assaying & laboratory procedures used &
whether the technique is considered partial
or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the analysis
including instrument make & model,
reading times, calibrations factors applied &
their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) & whether
acceptable levels of accuracy (i.e. lack of
bias) & precision have been established.
RC percussion samples were analysed for gold using 30
gram Fire assay with an Inductively Coupled Plasma
(ICP) finish. This technique is considered suitable
for determination of gold for this project. Fire
assays are classified as total assays.
Samples were analysed at ALS Laboratories located in
Perth, Western Australia. In addition to QC
measures implemented by VRL, internal audits
were undertaken by the Laboratory including the
use of internal reference materials, blanks and
duplicates.
Standard, blank and duplicate QAQC performance
reports compiled by an external database
consultant have been checked by VRL and
demonstrate an acceptable level of accuracy.
Verification of
sampling &
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
Assay data has been loaded into the company database
with significant intercepts checked and validated
using 3D geological software.
Drilling data is captured using Excel data entry
templates which are then loaded into an Access
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
(physical & electronic) protocols.
• Discuss any adjustment to assay data.
database by an external database consultant.
Location of data
points
• Accuracy & quality of surveys used to locate
drill holes (collar & down-hole surveys),
trenches, mine workings & other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality & adequacy of topographic control
Drill collars were picked up by a surveyor using a
differential GPS including relative level (RL)
Down-hole surveys recording dip and azimuth were
collected every 10m down- and up-hole using a
Gyro survey tool.
All data points are recorded in the GDA94, zone 51
south coordinate system.
Data spacing &
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing & distribution is
sufficient to establish the degree of
geological & grade continuity appropriate
for the Mineral Resource & Ore Reserve
estimation procedure(s)&classifications
applied.
• Whether sample compositing has been
applied.
RC drilling was undertaken on a nominal 25m x 25m
grid.
A previous geological/geostatistical study by external
consultants and reviewed by Verity geologists
determined that 25m x 25m intercept spacing
should be sufficient to achieve indicated resource
status in future mineral resource estimates. This
analysis will be verified on completion of this drill
program and return of all assay results.
Sample compositing was not applied with all samples
collected at 1m intervals.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures & the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation & the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed & reported if material
RC drill holes at Korong and Waihi are designed to be
drilled as close as possible to perpendicular to the
plane of mineralisation.
At Korong, reported intercepts in holes drilled at -60
dip are close to true thickness.
The difference between down-hole thickness and true
thickness will be allowed for in Mineral Resource
Estimation.
Sample security • The measures taken to ensure sample
security the different materials.
Individual samples were collected into pre-numbered
calico sample bags, placed into larger polyweave
bags and then cable tied.
Polyweave bags were placed in larger secured bulka
bags and dispatched to the laboratory via a contract
transport company.
Audits or reviews • The results of any audits or reviews of
sampling techniques & data.
No audits or reviews of sampling techniques & data
have been undertaken.
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a license to operate in the area.
All Korong drilling is located on Exploration
Licence E39/2024, held under the Mining Act
1978 (WA).
The tenements are held by Monument
Exploration Pty Limited, a wholly owned
subsidiary of Verity Resources Limited.
Royalties of up to 2% of gross revenue are held by
prior owners of the Monument Project.
Exploration done
by other parties
• Acknowledgment and appraisal of exploration
by other parties.
Exploration was undertaken by Carpentaria
Exploration Pty Ltd between 1977 and 1988
and by Carpentaria Gold Pty Ltd between 1994
and 1995. Eighty two (82) RC holes, and 15
Diamond Drill Holes were completed during
this period. A total of 7,459 metres of drilling
was reported principally at the Korong and
Waihi Prospects with gold mineralisation the
principal target.
Western Mining Corporation completed follow up
drilling between 1989 and 1993 with gold and
nickel mineralisation the focus principally at
the Anomaly 39 prospect. 38 RC holes and 5
diamond holes were completed for 1,993
metres.
Cedardale and Marengo Mining Limited drilled
nine RC holes in 2003 to incrementally
advance the project.
In 2016 and 2018 Syndicated Metals undertook
the first modern drill programs to substantially
advance the project toward a resource.
A drill program by Verity Resources (then called
SI6) in 2021 allowed for a mineral resource
estimate and inferred mineral resource later
that year.
Geology • Deposit type, geological setting and style of
mineralisation.
The Monument Gold Project (MGP) is located on
a north-westerly trending sequence of
Archaean meta-volcanics and meta-sediments
intruded by mafic and felsic rocks. This
sequence forms the western limb of the major
south-southeast plunging Mt Margaret
Anticline which is cored by a complex granitoid
batholith. The sequence generally dips
vertically or steeply to the east. The 1.4-
million-ounce Mt Morgan’s gold deposit,
hosted by banded iron formation (BIF), lies to
the south and east along strike from the MGP
project tenements.
The Korong and Waihi resources are located in
relatively weakly deformed (by orogenic gold
832High Street
Kew EastVIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
standards) BIF packages with quartz veining
and fine sulphides throughout. These textures
are interpreted as a chemical replacement of
magnetite by sulphide in the presence of gold-
bearing fluids that have also recrystallised
cherty layers of the BIF.
The MGP BIF sequence is about 100 m thick and
consists of several individual BIFs separated by
intercalated metasiltstones, minor ultramafic
rocks and massive and pillowed basalts. It dips
steeply to the east and faces westwards. Thus,
a possible overturned limb of an anticline.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
All holes drilled in this drill campaign are listed in
Appendix A
All intercepts of the main target zone are listed in
Appendix B regardless of the outcome.
Data aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
All intercepts are reported as the length weighted
average gold grade across the geological
context of mineralisation, that being the
veined zone of the BIF stratigraphy.
Intercepts are reported in that context regardless
of the grade of the intercept.
The strong stratigraphic control on mineralisation
means that intercepts reported in this
geological context are very similar to a rigid
0.5g/t cut off grade criteria for reporting,
however the geological criterion is
appropriate at this stage of the project.
This mineralisation style does not commonly
involve extreme outlier grades, and no top cut
is applied to reported intercepts.
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important
in the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
The geometry of mineralisation is well understood
and all inte
Share your feedback
Discover