Botswana Critical Metals Exploration Re-Commences
Released
Released
Announcement PDF
ASX Announcement
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
BOTSWANA CRITICAL METALS EXPLORATION RE-COMMENCES
Verity Resources Limited (VRL or the Company) (ASX:VRL, FSE:48B0) is pleased to announce the
commencement of a first-pass soil geochemical sampling and geological mapping program across its 100%-
owned PL123/2024 in the Limpopo Mobile Belt, Southeast Botswana. The program has been designed to
systematically screen the 903km² tenement for potential copper, silver, gold and nickel mineralisation, with
the aim of prioritising targets for follow-up ground geophysics and maiden drill testing.
Verity Director, Patrick Volpe, commented,
“Botswana is fast-becoming a highly sought after critical metals jurisdiction. The
commencement of this program marks an important step in unlocking the exploration
potential of PL123/2024. The Limpopo Mobile Belt is a world-class nickel-copper and critical
metals district, and with 2,868km² of tenure we have an opportunity to identify additional new
prospects in a proven address where we have already made high grade copper-silver and
nickel-copper discoveries. This first-pass program will give us the geochemical and geological
data needed to prioritise targets for ground geophysics and drilling.”
Verity is advancing its 2,868km² critical metals portfolio within the Limpopo Mobile Belt in Botswana, a
Proterozoic orogenic belt recognised globally for hosting major Ni-Cu producing operations. The Company’s
Botswana portfolio already includes a JORC (2012) Inferred Mineral Resource of 2.4Mt @ 0.72% Ni, 0.21%
Cu + PGEs + Co + Au at Maibele North (delineated in 2015) and previously drilled high-grade Cu-Ag
discoveries at Airstrip and Dibete (Figure 1). PL123/2024 represents a new frontier in Verity’s systematic
district-scale exploration strategy in Botswana.
HIGHLIGHTS
• First-pass soil sampling and geological mapping commenced across recently granted PL123/2024,
prospective for copper, silver, gold and nickel
• Program aims to target mineralisation hosted in Archaean metasediments analogous to Selebi Cu-
Ni Mine owned by NexMetals Mining Corp. (NASDAQ: NEXM), 20km west of PL123/2024
• 26.6Mt @ 0.58% Ni and 1.03% Cu was mined at Selebi Shaft (1980 to 2016) and 13.9Mt @ 0.74%
Ni and 0.66% Cu was mined at Selebi North (1990 to 2016)
• NexMetals’ Selebi Mine project now hosts 24.7Mt @ 3.42% CuEq (Inferred) and 3.0Mt @ 2.92%
CuEq (Indicated) (NI 43-101), and is continuing to grow
• PL123/2024 covers 903km² and forms part of Verity’s 2,868km² critical metals landholding in the
Limpopo Mobile Belt, Eastern Botswana - one of Africa’s premier Ni-Cu-Co districts
• NexMetals’ Selebi Mine project received a US$150M Letter of Interest from the Export-Import
Bank of the United States in July 2025
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Figure 1: VRL tenement portfolio in Eastern Botswana
PL123/2024 is located adjacent to the south of the Company’s existing portfolio. The licence is also
positioned approximately 20km east of the Selebi Ni-Cu mine, which includes rail infrastructure, water
storage and tailings facilities - representing significant existing district infrastructure.
The Selebi mine and processing facility has been on care and maintenance since 2016 and is now owned by
NexMetals Mining Corp. (NASDAQ: NEXM). The mine operated from 1980 until 2016 - a 36-year operating
life - producing 26.6Mt at 0.58% Ni and 1.03% Cu, and at peak employed over 5,000 people. The facility
remains fully permitted and in July 2025 NexMetals received a US$150M Letter of Interest from the Export-
Import Bank of the United States, underscoring renewed institutional interest in the district. NexMetals’
Selebi Mine now hosts a 24.7Mt @ 3.42% CuEq Inferred and 3.0Mt @ 2.92% Indicated NI 43-101 Resource1
.
The Selebi mine is hosted within the same Archaean metasedimentary sequence that Verity is targeting
across PL123/2024 (Figure 2).
1
Reference: NexMetals Mining Corp. Selebi Mines NI 43-101 Mineral Resource Estimate Technical Report – effective date: June 30, 2024. The information is
provided for regional geological context only, and the presence of mineralisation at Selebi Mine is not necessarily indicative of mineralisation on the Company’s
projects.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Geological Setting and Prospectivity
PL123/2024 lies within the Central Zone of the Limpopo Mobile Belt, underlain by an Archaean
metasedimentary gneiss sequence containing mafic–ultramafic amphibolite units — the same host lithology
as the Selebi Phikwe Ni-Cu mine, approximately 20km to the west. The licence is considered prospective for
nickel-copper (including cobalt) orthomagmatic sulphide mineralisation of the style demonstrated at Selebi
and confirmed at Verity's Maibele North Inferred Resource (2.4Mt @ 0.72% Ni, 0.21% Cu + PGEs + Co + Au),
with structurally controlled high-grade Cu-Ag of the style previously intersected at the Company's Airstrip and
Dibete prospects to the north, and for gold, a shear-zone hosted style well-documented within the Limpopo
Mobile Belt and occurring as an accessory metal at Maibele North. Soil geochemical results will be integrated
with existing airborne electromagnetic (Geotem) data, with coincident anomalies prioritised for follow-up
ground EM and magnetics ahead of maiden drill testing.
Soil Sampling Program
Approximately 200 soil samples will be collected on lines oriented perpendicular to the regional NE-SW strike
and spaced ~50m apart, providing systematic coverage of PL123/2024 (Figure 2). Assays will target copper,
silver, gold, nickel and cobalt. Concurrent geological mapping will document lithological contacts, structural
trends and alteration. Results will be used to prioritise targets for follow-up ground geophysics and maiden
drill testing.
Figure 2: Proposed first-pass soil sampling grid across PL123/2024 over Geotem and archaean meta-sediments.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
This announcement has been authorised for release by the Board of Verity Resources Limited.
For further information, please contact:
Verity Resources Limited
info@verityresources.com.au
About Verity Resources
Verity Resources owns 100% of the Monument Gold Project located near Laverton in Western Australia. The Project hosts a JORC-
compliant (2012) Mineral Resource Estimate of 2.5Mt @ 1.72g/t Au for 137,700oz, comprising 1.18Mt @ 1.75g/t Au for 66,200
ounces Indicated and 1.32 Mt @ 1.69g/t Au for 71,500 ounces Inferred. See ASX announcement on 12 May 2026 "Maiden Indicated
Resource Declared at Monument Gold Project" for further information.
Verity Resources also holds a supply critical metals portfolio via a joint venture that includes rare earth elements, lithium, gold, base
and precious metals in Brazil, including licences in the “Lithium Valley” and Poços de Caldas in the state of Minas Gerais. The Company
also owns 70% of the Pimenta Project, a potential large-scale REE project in eastern Minas Gerais.
Verity Resources also holds 100% of large critical metals projects in the Limpopo Mobile Belt in Botswana. Maibele North currently
hosts a JORC (2012) inferred resource of 2.4Mt @ 0.72% Ni and 0.21% Cu + PGEs + Co + Au.
Competent Persons Statement (Botswana)
The information in this report that relates to Exploration Results and the Mineral Resource Estimate for the Botswana projects
(Maibele North, Dibete and Airstrip) is based on, and fairly represents, information and supporting documentation reviewed by Mr
Paul Lemmon, a Registered Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP)
and the Competent Person appointed by Verity Resources Limited for the Botswana projects. Mr Lemmon has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Lemmon consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
The Maibele North Mineral Resource Estimate was originally prepared by MSA Group and is extracted from the ASX announcement
dated 28 April 2015 “Maiden Inferred Resource for Maibele North”, available at www.verityresources.com.au. The Company confirms
that it is not aware of any new information or data that materially affects the information included in that announcement, and that
all material assumptions and technical parameters underpinning the estimate in that announcement continue to apply and have not
materially changed.
Cautionary Statement of Foreign Estimates
The information relating to the Selebi Mine deposit owned by NexMetals Mining Corporation (NexMetals) is based on publicly
available information released by NexMetals available at https://nexmetalsmining.com/projects/. The Selebi Mine deposit is not
owned by the Company and does not form part of the Company’s Project. The reported estimate was prepared under Canadian NI
43-101 standards and has not been reported in accordance with the JORC Code 2012. A Competent Person engaged by the Company
has not done sufficient work to classify the estimate as a Mineral Resource or Ore Reserve in accordance with the JORC Code. The
information is provided for regional geological context only, and the presence of mineralisation at Selebi Mine is not necessarily
indicative of mineralisation on the Company’s Project.
Disclaimer
In relying on the above mentioned ASX announcement and pursuant to ASX Listing Rule 5.23.2, the Company confirms that it is
not aware of any new information or data that materially affects the information included in the above announcement. No
material exploration data or results are included in this document that have not previously been released publicly. The source of
all data or results have been referenced.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s mineral properties, planned exploration program(s) and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may,” "potential," "should," and
similar expressions are forward looking statements. All such statements are subject to certain risks and uncertainties, many of
which are difficult to predict and generally beyond the control of the Company, which could cause actual results to differ materially
from those expressed in, or implied or projected by, the forward-looking information and statements. Our audience is cautioned
not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or
to reflect the occurrence of or non-occurrence of any events.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from the following Company announcements
released to the ASX:
• ASX:VRL 27 May 2024 “SI6 Expands Botswana Copper-Silver Portfolio”
• ASX:VRL 28 April 2015 “Maiden Inferred Resource for Maibele North”
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
JORC Code, 2012 Edition – Table 1
Appendix A – JORC CODE, 2012 Edition
Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature & quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity & the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
No new sampling data is included in this
announcement. The announcement describes the
commencement of a soil sampling campaign.
Results will be reported in a subsequent
announcement upon receipt of laboratory assays.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) & details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented & if so, by
what method, etc.).If no site visits have
been undertaken indicate why this is the
case.
No new drilling data is included in this announcement.
Drill sample
recovery
• Method of recording & assessing core &
chip sample recoveries & results assessed.
• Measures taken to maximise sample
recovery & ensure representative nature of
the samples.
• Whether a relationship exists between
sample recovery & grade & whether sample
bias may have occurred due to preferential
loss/gain of fine/coarse material
No new drilling data is included in this announcement.
Logging • Whether core & chip samples have been
geologically & geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining studies
No new sampling data is included in this
announcement.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
& metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
• The total length & percentage of the
relevant intersections logged
Sub-sampling
techniques &
sample
preparation
• If core, whether cut or sawn & whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc.& whether sampled wet or
dry.
• For all sample types, the nature, quality &
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
No new sampling data is included in this
announcement.
Quality of assay
data &
laboratory tests
• The nature, quality & appropriateness of the
assaying & laboratory procedures used &
whether the technique is considered partial
or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the analysis
including instrument make & model,
reading times, calibrations factors applied &
their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) & whether
acceptable levels of accuracy (i.e. lack of
bias) & precision have been established.
No new assay data is included in this announcement.
Airborne electromagnetic (Geotem) data displayed
in Figure 2 was sourced from a regional
reconnaissance survey conducted by the Botswana
Geoscience Institute (BGI) (formerly Botswana
Geological Survey) over the area and is used as
contextual reference for target identification within
PL123/2024. This data was not generated by or for
Verity Resources Limited and is presented as
regional geological context only.
No proprietary geophysical survey was conducted by or
on behalf of the Company for this announcement.
Verification of
sampling &
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical & electronic) protocols.
• Discuss any adjustment to assay data.
No new sampling data is included in this
announcement.
Location of data
points
• Accuracy & quality of surveys used to locate
drill holes (collar & down-hole surveys),
trenches, mine workings & other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality & adequacy of topographic control
All data is reported and acquired using WGS84
coordinate system.
Data spacing &
distribution
• Data spacing for reporting of Exploration
Results.
No new sampling data is included in this
announcement.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
• Whether the data spacing & distribution is
sufficient to establish the degree of
geological & grade continuity appropriate
for the Mineral Resource & Ore Reserve
estimation procedure(s)&classifications
applied.
• Whether sample compositing has been
applied.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures & the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation & the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed & reported if material
No new sampling data is included in this
announcement.
Sample security • The measures taken to ensure sample
security the different materials.
No new sampling data is included in this
announcement.
Audits or reviews • The results of any audits or reviews of
sampling techniques & data.
No new sampling data is included in this
announcement.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a license to operate in the area.
Prospecting Licence (PL) 123/2024, is held by
African Metals (Pty) Limited, a wholly owned
subsidiary of Verity Resources Limited.
The Company is not aware of any material
impediments to holding or operating on the
tenements at the time of this announcement.
Exploration done
by other parties
• Acknowledgment and appraisal of
exploration by other parties.
No historic exploration drilling by other parties has
been reported over PL123/2024. Regional
open-file aeromagnetic data sourced from BGI
has been used as a contextual reference for
target identification. No material exploration
data generated by third parties is included in
this announcement.
Geology • Deposit type, geological setting and style of
mineralisation.
PL123/2024 lies within the Central Zone of the
Limpopo Mobile Belt in southeast Botswana,
underlain by an Archaean metasedimentary
gneiss sequence containing mafic–ultramafic
amphibolite units — the same host lithology as
the Selebi Phikwe Ni-Cu mine, approximately
20km to the west. The licence is considered
prospective for: (i) orthomagmatic Ni-Cu (±Co,
PGE) sulphide mineralisation of the style hosted
at Selebi and confirmed at Verity’s Maibele
North Inferred Resource (2.4Mt @ 0.72% Ni,
0.21% Cu + PGEs + Co + Au); (ii) structurally
controlled Cu-Ag mineralisation; and (iii) shear-
zone hosted gold, a style well-documented
within the Limpopo Mobile Belt.
No mineralisation has been defined within
PL123/2024 to date. The current program is
first-pass in nature.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Not applicable. No drilling results are reported in
this announcement.
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
Competent Person should clearly explain why
this is the case.
Data aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Not applicable. No assay results are reported in this
announcement.
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important
in the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Not applicable. No assay results are reported in this
announcement.
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Figure 1 presents the VRL tenement portfolio in
eastern Botswana, illustrating the location of
PL123/2024 relative to the Company’s existing
licences and regional infrastructure. Figure 2
presents the proposed first-pass soil sampling
grid across PL123/2024, displayed over Geotem
AEM data and Archaean metasediment
coverage.
No new drill hole or sample location data is
reported in this announcement.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
The announcement is considered balanced. No
assay results are reported. Previously published
exploration results referenced in the
announcement are reported consistently with
their original disclosure.
Other substantive
exploration data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
A review of existing airborne electromagnetic
(Geotem) data has identified multiple
conceptual exploration targets within
PL123/2024 to be systematically tested by the
current soil geochemical sampling program.
These targets are conceptual in nature, there has
been insufficient exploration to define a
Mineral Resource, and it is uncertain whether
further exploration will result in the estimation
of a Mineral Resource.
Further work • The nature and scale of planned further work Approximately 200 soil samples are planned across
832 High Street
Kew East VIC 3102
info@verityresources.com.au
Verity Resources Limited | ASX: VRL | FSE: 48B0
ACN 122 995 073
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
PL123/2024, collected on lines oriented
perpendicular to the regional NE-SW strike and
spaced ~50m apart. Samples will be submitted
to an accredited laboratory (ALS South Africa)
for Cu, Ag, Au, Ni, Co and pathfinder element
assays.
Subject to results, coincident geochemical and
geophysical anomalies will be prioritised for
follow-up ground electromagnetic and
magnetic surveys, with the aim of generating
targets for maiden drill testing. Further work
will be reported upon receipt and assessment
of results.
--- Ends ---
Share your feedback
Discover